My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/08/14 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/08/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2019 11:50:42 AM
Creation date
12/12/2019 11:49:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/14/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 0 Project: Horizon Elementary School Walk Route Safety <br /> Change Order No. 2 <br /> Change Order Effective Date: July 29,2013 <br /> CONTRACTOR <br /> By ?-401e Date: m / 1.'. <br /> Officer <br /> Exhibit A—Description of Changed Work: <br /> This Change Order#2 modifies 3 bid items to the contract as identified below. <br /> Bid Item 3—Removing Cement Conc.Sidewalk. Modify bid item 3 entitled,"Removing Cement <br /> Conc. Sidewalk",at the unit price of$45.00/SY,for an estimated quantity increase of 170 square yards <br /> of"Removing Cement Concrete Sidewalk"for a total contract price increase of$7,650.00. <br /> Bid Item 24—Private Improvement Restoration& other Modifications. Modify bid item 24 <br /> entitled, "Private Improvement Restoration& other Modifications",at the estimated force account <br /> price of$5,000.00,for"Private Improvement Restoration&Modifications"where existing <br /> improvements were adversely impacted during construction resulting in an estimated increase to the <br /> contract in the amount of$5,000.00. <br /> Bid Item 27—Potholing. Modify bid item 27 entitled, "Potholing", at the estimated force account <br /> price of$62,000.00, for"Potholing"of existing utilities resulting in an estimated increase to the <br /> contract in the amount of$62,000.00. <br /> The total net price increase cost as a result ofaWing/bid item ncreases the contract in the amerunt <br /> of S74,650.00. <br /> Exhibit B —Justification: <br /> Bid Item 3—Removing Cement Conc.Sidewalk. This bid item is being modified to pay for <br /> removing additional cement concrete sidewalk beyond the plan quantity. <br /> Bid Item 24—Private Improvement Restoration& other Modifications. This bid item is being <br /> added to pay for restoring private improvements that have been impacted during construction. <br /> • <br /> Bid Item 27—Potholing. This bid item is being added to pay for potholing existing utilities,not <br /> shown on the contract plans,so that they may be avoided during directional drilling. <br /> Page 3 of 4 • <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.