Laserfiche WebLink
j <br /> Proposed Modernization nnd Addirloi�s to Subsurface Exploration, Geologic Hazardr, <br /> Eisenhower Middle School and Geotechniad Engineering RepoR <br /> Evei�rr, WarhinRron Des`gn Recommendations <br /> foundations at a given point, the overexcavation lateral limit should extend 3 feet beyond the <br /> building footprint up to a maximum of 4 feet. Removal of existing fills should not undermine <br /> or compromise the support soils of existing founuations or slab-on-grade. Once suitable native <br /> soils have been reached, strucmral fill can be placed to restore the desired building pad <br /> elevation. Fill material should be selected and placed in accordance with recommendations in <br /> the Structural Fill section of this report. <br /> If pin piles are to be used for foundation support in areas underlain by deeper existing fill, and <br /> the slab is co be supported on underlying soil, the building pad should be overexcavated to <br /> approximately 2 feet below slab subgrade. The overexcavated surface should be proof-rolled <br /> or compacted. Any soft, loose, or yielding areas should be excavated to expose firm, <br /> unyielding soils. The subgrade should then be ,:ompacted to at least 95 percent of tne modified . <br /> Proctor maximum dry densiry as determined by the ASTM:D 1557 test procedure. Two feet <br /> of strucmral fill to support the proposed slab-on-grade can then be placed. Where pin piles are <br /> to be used for foundatio❑ support and where the foundation slab is to be designed as a <br /> strucmral slab and supported on the piles, no subgrade preparation beneath the pile-supported <br /> structure will be required. Recommendations for pin piles are presented in the Foundations <br /> section of this report. <br /> If GeopiersT°' or rock trenches will be used to support foundations in areas underlain by deeper <br /> existing fiil, the building pad should be excavated to approxicrately 2 feet below slab subgrade. <br /> The surface should be proof-rolled or compacted. Any soft, loose, or yielding areas should be <br /> excavated to expose firm, unyielding soils. The subgrade should then be compacted to at least <br /> 95 percent of the modified Proctor maximum dry densiry as determined by the ASTM:D 1557 <br /> test procedure. Two feet of structural fill to support the proposed slab-on-,q,rade can be placed <br /> followine the installation of GeopiersT" or rock trenches. Additional recommendations for <br /> GeopiersT"as� rock trenches are presented in the Foundations section of this report. <br /> If construction will occur durinQ winter weather conditions, we recommend that the upper 6 to <br /> 12 inches of the buiiding pad consist of railroad ballast, crushed concrete, or sand and gravel <br /> that contains less than 5 percent passing the U.S. No. 200 sieve, based on chat fraction passing <br /> the U.S. Na 4 sieve. The purpose of this select fill is to provide a working surface that is <br /> compatible with moderately wet site and weather conditions. Depending on field conditions, <br /> geotextile fabric, such as ,�tirafi SOOX or equivalent, might be needed beneath areas where <br /> heavy traffic is expected. <br /> In our opinion, stable construction slopes should be the responsibiliry of the contractor and <br /> should be determined �iurine cons[ruction. For estimating purposes, however, we anticipare <br /> that temporary, unsupportecl�cut slopes in the existing fill can be made a[ a slope of I.SH:1V. <br /> The underlying till can be excavated at an�ies ot' ?'+H:I V or flatter. These slope angles assur:ie <br /> that a,round wa[er seepa��e is not strone enoueh [o reduce siope stability and that surface water <br /> is not allawed to t7ow across the temporary slope faces. If eround or surface warer is present <br /> Janunn' I3. _'OOd ASSOClATE�E.iRTN SC/E.VCES, INC. I � <br /> .1fTIJ. .:�q0!'JB�IJ-Y.,qrcrsLl,h,r?IyiXE�tPP- It^K page 11 <br />