Laserfiche WebLink
. t , <br /> Propc.sed Modemization and Additians to SWisurface Exp[oration, Geofogic Ha;.ards, <br /> Eisenhower Middle School and Geotechnica!Engineering Repon <br /> Everett. WarhinRton DesiRn Recommerdations <br /> allowable bearing pressure of 3,000 psf including both dead and live loads. An increase of <br /> one-third may be used for short-term wind or seismic loading. <br /> 10.4 Alternate Foundation Support Usin� Rock-Filled Trenches <br /> Another alternative Cor foundations in existing fill areas would be to support foundations on <br /> rock-filled trenches that extend to suitable bearing soils beneath the existing fill. Where rock <br /> trenches are used, the building pad should be excavated as needed to provide a surface that is <br /> at least 2 feet lower than the building pad subgrade elevation. This will allow placement of a <br /> 2-foot-thick structural fill blanket for slab support. The building pad excavation should be <br /> proof-rolled and any soft or yieldiitg areas removed and replaced with structural fill. Rock <br /> trenches can then be installed. The trenches shou(d have a minimum width of 4 feet (or as <br /> designated by �'ze field engineer/engineering geologist) and be excavated down to suitable till, <br /> which was encountered at depths of up to 7 feet below the exist°ng ground surface at the time <br /> of exploration. All rock trenches must penetrate to the prescribed bearing stratum and no <br /> trenches should be founded in or above loose, organic, or existing fill soils. Because of the <br /> potential for caving, the actual trench width may be greater than specified. It wou13 be <br /> appropriate to backfill the trenches as the excavation proceeds to reduce caving. The use of.: <br /> larger, track-mounted backhoe will greatly speed trench excavation over the use of a <br /> conventional rubber-tired backhoe. In order to reduce dismrbance of the bearing soils exposed <br /> in the trench, we recommend that the teeth of the backhoe bucket be covered with a digging <br /> p�:te. <br /> To determine when suitable bearing has been achieved and to verify proper rock placement, <br /> the georechnical engineer/engineering geologist must be present an a full-time basis during <br /> footing trench excavation and backfill. A pump may be required to control seepage so that the <br /> bearing level can be visually determined. Seepage entering the excavation on an overnight <br /> basis must be removed prior to commencing trench excavation the following day. <br /> After the bearing stra;um has been reached, the trench should be immediately backfilled. We <br /> recommend the use of "railroad ballast" or 2- to 4-inch si2e crushed rock for backfill. The <br /> crushed rock must be tamped into place in maximum 2-foot lifts to achie�e a [ighdy packed <br /> mass; this may be done with either a "Hoepac" rype compactor mounte:i on the backhoe or <br /> more typically, with the bucket of the backhoe itself. Staging areas should be maintained so <br /> that the rock is not contaminated by mud prior ro placement in the trer.ch. Equipment access <br /> to trench locations should also be maintained. Once rock trench placement is complete, the <br /> building pad can be cleared a:�d brought to grade with structural fill. <br /> Spread footings may then be used for building support when placed and cenrered over properly <br /> constructed rock trenches that bear on suitable till. Footings which bear on approved rock <br /> trenches may be desiened for an allowable bearing pressure of 3,000 psf including both dead <br /> and live loads. An increase of one-third may be used for short-term wind or seismic loading. <br /> lmu�an ?3, 200d ASSOCIAT£D E.-IRTH SGE:VCES, 'VC. ��.\ <br /> .tlT4J-F'EOJ7J9dJ-Prn�ran7l,�JJ7i9iA'E�R'P-R=8 P3gC I7 �/1�) <br /> `.� <br />