Laserfiche WebLink
1 <br /> , Proposed Vew R�dge Subsurfare Erpforation, Geologic Naards, lnfil�rWion Po�ential, <br /> Elememary Schoo!Replacement and Preliminary Georerhnical Engineering Report <br /> £ve�ett, Washington Prefiminary Desrgn Recommendmions <br /> , [hat temporary, unsupported cut slopes in the existing fill can be made at a maximum slope of <br /> I.SH:iV (HorizontaL•Vertical) or flatter. Temporary slopes in unsamrated advance outwash <br /> , may be planned at 1H:1V. As is typical with earthwork operations, some sloughing and <br /> raveling may occur, and cut slopes may have to be adjusied in the field. If ground water <br /> seepage is encountered in cut slopes, or if surface water is not routed away from temporary cut <br /> ' slope faces, Flatter slopes will be requ'ved. In addition, WISHA/OSHA regulations should be <br /> followed at all times. Permanent cut and swctural fill slopes that are not intended to be <br /> ' exposed to surface water sho�ld be designed at inclinations of 2H:1V or fla[ter. All permanent <br /> cut or fill slopes should be compacted to at least 95 percent of the modified Proctor maximum <br /> dry densiry, as determined by ASTM:D 1557, and the slopes should be protected from erosion <br /> ' by sheet plastic until vegetation cover can be established during favorable weather. <br /> 9.7 Frozen Subgrades <br /> ' If earthwork takes place during freezing conditions, ail exposed subgrades should be a►lowed to <br /> thaw and then be recompacted prior to placing subsequent lifts of structural fill or foundation <br /> ' components. Alternanvely, the frozen material could be stripped from the subgrade to reveal <br /> unfrozen soil prior to placing subsequent lif�s of fill or foundation components. The frozen <br /> soil should not be reused as structural fill until allow�d to thaw and adjusted to the proper <br /> ' moisture content, which may not be possible during winter months. <br /> , ]0.0 STRUCTURAL FILL <br /> ' AI1 references to swcturaf fill in this report refer to subgrade preparation, fill type and <br /> placement, and compaction of materials, as discussed in rhis section. If a percentage of <br /> compaction is specified under another section of this report, the value given in that section <br /> ' should be used. <br /> Aker stripping, planned excavation, and any required overexcavation have been performed to <br /> ' the satisfaction of the geotechnical engineer, the upper 12 inches of exposed ground in areas to <br /> receive fill should be recompacted to 90 percent of the modified Procror maximum density <br /> , using ASTM:D 1557 as the standard. If the subgrade contains silty soils and too much <br /> moisture, adequate recompaction may be difficult or impossible to obtain, and should probably <br /> not be attempted. 1n lieu of recompaction, the area to receive fill should be blanketed with <br /> ' washed rock or quarry spalls to act as a capillary break between the new fill and the wet <br /> subgrade. Where the exposed ground remains soft and further overexcavation is impractical, <br /> placement of an engineering stabilization fabric may be necessary to prevent contamination of <br /> ' the free-draining layer by silt migration from below. <br /> ' Septemlier 22, 20/0 �� ASSOGATF,D F_ARTH SC/ENCF.S. /NG �, <br /> 9WG/!b-KF/�A7ZSSA1 r.��.�r�zaoozssiKF�wr Page 16 � <br /> ' <br />