Laserfiche WebLink
IGcok•chnicnf Enginccring Rcpur� l ( J�aic 1. 1009 <br /> Crunnnuiiro Hcnl(G Cen�cr. Evcrc(4 (1:! Project k'009-1SJ <br /> I <br /> 1.0 PRO.IECT DESCRIPTION <br /> I "fhe projcct site is locatcd at the suuthwcst corncr of 14'" Stmet and Aroadway Avenu� in <br /> Lverctt. �Vashington. Thc site address includes 1402, 140G, and 1430 Broadway A��enue. <br /> The approximatc location of the site is shown on the Site Vicinity Map, Figure I. The sitc <br /> is currently occupicd by mcdical / health service buildings in the southem portion of thc <br /> site. The northcrn portion of the site is a landscaping area. <br /> � RGI undcrstands that thc clicnt is pl�nning to build a new commun'sty health ccntcr <br /> (approsimately 18.000 square feet) in the northem portion of the site. The existing <br /> buildings ���ill br demolishcd and become the futurc parking lot Our understandine cf 1;ie <br /> i project is based on thc Sitc Plen Option I3 prepared by Giflin I3oltc Jurgens Architects <br /> datcd May 21. 2009. At the timc of thc prcparation of this rcport, detailed site erading and <br /> Ibuilding plans were not a��ailable for our revie�v. [3ased on the conversation with clicnt, <br /> i RGI expccts lhat the proposed building will be two-slory structurc, supported on perimeter <br /> �valls witli a bcaring load of 2 to 3 kips per lincar foot, and a serics of columns with a <br /> maximum load up to 7� kips. RGI cxpccts that minar sitc grading �vill bc needed for thc <br /> development. <br /> I Thc reconuncndations in lhe following sections of this rcport are bascd upon our <br /> understanding of tlic abovc design fcatures. If actual t'eature� vary or changcs arc made, <br /> we should revic�v thcm in ordcr to modify our rccatnmcndations as rcquired. In addition. <br /> I RGI rcqucsts to revicw tinal dcsign dru�vings and specitic�tions to verify that oiv projcct <br /> understanding is corrcct and that our rccomme�.iations h;n�c becn properly interprctcd and <br /> I ii�corporated inlo projcct design and construction. <br /> 2.0 SCOPE OF�YORK <br /> On May 26, 2009, RGI drilled a tolal oP six test borings to a ma�imum depth ol'21.� t'eet <br /> bclo�v grotmd stvfacc (bgs). "I'cst burings wcrc drillcd with a truck-mount. hollow stem <br /> augcr drill rig. Tcst borings (I3-I through D-4) were drillcd �vithin the proposcd building <br /> I footprinl area. Test borings (13-� and D-G) were drillcd in the proposed parking and <br /> Jriveway arcas. Thc appro�imate test boring locations are shown on figure 2. <br /> I Using the inl'orm�tion obtained from our subsurface exploration, we performcd analyscs to <br /> devclop gcotechnical recommcndations for projcct design and construction on thc <br /> following: <br /> I � 5oil and ground�vater conditions i Foundation support <br /> : 3eismic considerations : Slab-on-grade support <br /> Ii Site preparation and grading � Utilities <br /> i SUuctural till recommendalions i Pavements <br /> I <br /> I 'fhe Riley Group, Inc. a� <br /> I <br />