17.4 Engineering News Record occasionally revises indices. Engineering News Record <br /> Construction Cost Indices used in the calculations described above will be those currently <br /> published at the time the Economic Price Adjustment calculation is performed. No <br /> retroactive adjustments will be made as a result of an Engineering News Record revision. <br /> Revised Construction Cost Indices, if any, will be used in subsequent calculations. <br /> 17.5 Under all circumstances, should the Contractor submit a Job Order Proposal with inaccurate <br /> Adjustment Factors, the act of submission by the Contractor is a waiver of all rights to any <br /> further compensation above the Job Order Price submitted in the Job Order Proposal. <br /> 17.6 The Contractor cannot delay submission of the Job Order Proposal past the due date to <br /> take advantage of a scheduled update of the Adjustment Factors. In that event, the <br /> Contractor shall use the Adjustment Factors that would have been in effect without the <br /> delay. <br /> 17.7 The Adjustment Factor for Non Pre-priced Tasks will remain constant for the duration of the <br /> Contract. <br /> END ARTICLE 17 <br />