My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
Geotech Report
>
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:03:57 PM
Creation date
12/26/2019 8:33:55 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( <br /> � . �'u���.tiiu�..l Ifll ��Lr.. �l :i:eu:u, � :iln,�"�.�_, ,. ..liic ..r.iic- :,i�,�� � ila:��l,il� ��:in. .i ��u!,I ni��:� '.hc <br /> rcquirrmcnts of \1�SUOT �pccilicatiun 9-0:.1:( 1). Gr;n�cl 13uc{:fill I��r I)r:iin� ��r cuniist ��� pra <br /> I ��rit cl. <br /> • Structural till placed tbr cast-in-place ��'nll drains should mcet the requirem�nts of 1VSUOT <br /> Spcciticatiun 9-03.1'_(3); Gruvel Hncklill for AValls. <br /> j • Structura! fill pl.�ced as capillar} break matcrial below slab-on-�zrede floors should meet thc <br /> requirements of�VSDOI' Speci�ication 9-03.17, Foundation �taterial Cluss A. <br /> � • Struchiral IiU pl.iced as crushed surfacing b.ise course bclow pavements and sidc��alks should <br /> ; mcct thc rcquirements of�«'SDO"f Specificution 9-039(3), Crushed Surfacing Pase Coursc. <br /> ' On-sile Snils. fhe un-site soils are muis�ure sensiti�e, tine-��rained soils that �vill become ea�ih <br /> �. disturbed when �veL Q.ised on our labonton- testim_. the majurity of the escav�ted soils «ill likel} ha�c <br /> in-situ moisture cuntents near the optimum required �i�r cumpaction. 1lo�vever, the soils contain <br /> I escessive fines and do not nuet the �_radation criteria specilied aboce Cor use beneath footines ar.d siubs <br /> � .md in drainaee zoncs. If the conu'actor wishcs to use on-site soils lix structur:d till in ethcr arc:i;. <br /> Gcolim,inccrs c.m cc.ilu;uc thc on-sitc soils for suit;�bili[y as suuch�ral lill. <br /> Irill Placemenl :u�d Compaclion G'iteri:�. Strucun'al till should be mcchanically :ompacted to a tirm. <br /> non-�icldin� condition. Structural till should bc placeJ in luosc lifis no[ c�ccedin, I foot in thicknr., <br /> ��hen compactcd using hcrvy compaction equipment. Loose lifts on the order of�1 to 6 inches ma� Lr <br /> necessary �vhcn h:md compaction equipment is used. Bach li�t should be conditioned tu th� pruper <br /> moistwe content and cumpacicd to the spccificd density bef�re pl;icine subscqueN lifts. Structural tlll <br /> should bc cumpactcd to thc follo��inc critcria: <br /> I . Structural lill pl;�ccd in building areas (suppurting li��hllt' loadcd fnunda[ions or slah on gr;i�r <br /> iloorsl and in pa��ement and sidewalk arcas (including utility trench backfill) should br <br /> � cortipacred to at least 9� percent of the musimum dry density (�IDU) estim;i[ed in accordancr <br /> I ��ith :\S"I �t D I i>7. <br /> . Su'uctural till placed against sub�_rade ��:ills ;houlJ be cumpacted to bet��'een 90 ;md 9_' percent. <br /> ( Care should bu taken ���hen c„ni��;i�tine till ac.iin�t ,ub,url`,iee ���alls tu ;n�oid ucer-compactiun <br /> and hcncc uvrrstressing thc �c;ills. <br /> , A1'u recoiuincnd th:u Geo6nginecr; he �n�c:rnt �lurine pr,rot=rollin_ ❑nJ!or probine of thc �.�poscd <br /> � ;uberade soils in buildin� and pa��cment urca�. :uul pluccment of svuctural till. AV'c «ill ecaluat� th� <br /> adcquacy of Ihc suberadc soils and idcntih ;�reas- nceding Curther��urk. perform in-place muisture-density <br /> tc,u in the �ill to verifj' compli:uue �vith [he compaction specitic�tions, and :idvise on any mudilicatiuns <br /> tu th� procedures which mac be approprinte ror the prevailing cunditions. <br /> � Wr.�ther Consider:itions. The un-site soils contain a ;ufticien[ percentage uf lines (silt ;md clay) to b� <br /> moisture scnsidvc. When the moisturc content o( thcsc soils is more than a fcw percent abo�'e thc <br /> optimum muisture contcnt. thcse suils beconu mudd� and unstable and operation of eyuipment on these <br /> � soils is dil7ieult. :\ddiuon:ill�. disturbance uf ne;u' sur�ace wils should be e�pected if earth«nrk is <br /> complereJ Juring periuds of wet ��cathcr. Durim� �cet �vcather. wc recomntend tha[: <br /> • l he cround surCace in ;md around the work are;� should be sloped io that surGtce �va[er is directed <br /> .nv:w tYom the work arca. l he �round iurGue should be graded such th��t areas of punded water <br /> � do not de��clop. ��te.isures ;hould be takcn b�� the contr:�ctor to pre��cnt ,urface �vater ti�um <br /> eollcctine in e�c:n;uion; aml u�nchcs. \Ir:uur�s ,liould b� implemcntcd tu rcmovc sur(zcc �vatcr <br /> fiom thc work arca. <br /> � <br /> �.i(:1n l0"3.�'-rJU�l/U -- �— — _"-- "�'����"�--'— GEOENGINEERS� <br /> . i�;ue� I1. 'OrIG <br />
The URL can be used to link to this page
Your browser does not support the video tag.