My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
Geotech Report
>
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:03:57 PM
Creation date
12/26/2019 8:33:55 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> I <br /> I RECOMMENDED ADDITIONAL GEOTECHNICAL SERVICES <br /> � Geo[neineers should be retained to re��iew the project plans and �peciticutions ��hen completc to cunfinn <br /> � that our design rccommcndstiuns havc bcen implemcnted as inrended. If a soil n.iil �vull is s<Iccted. �ce <br /> � can prcpare the soil nail shorine wall plans and speci(ications. <br /> ' During constniction, Geol?nginecrs should observe Ihe installation of the shoring systent review/collect <br /> shoring tnonitoring data, evaluate tlie suitability of the fowtdation suberades, obscr�'e inst:�llation of <br /> subs'urf:ice drainace mensures, ecaluate structural backtill, and provide a summ:ir} Ietter o( uur <br /> ' c��nstruction observation scrviccs. llie purposes of our construction phase scrvices are to confinn diat the <br /> subsurfacc conditions arc consistent with those obscrvcd in dic borines ;md other rea�ons described in <br /> ;\ppendix D, Report Limitations and Guidclines for Use. <br /> I LIMITATIONS <br /> � AVc hu��e prcparcd this report for thc exdus-i��c usc ol Pro��i.lcnce I:���rctt �lcdic:il C�nter ❑nd dieir <br /> authorized acents lor the project site. The data should L� provided to prospectice contractors fur their <br /> bidding or estimating purpusus, but our report and interpretations should not be construed as a �c�nant� uf <br /> � [he subsurfacc condition�. <br /> �1'ithin the limi�mions of scope. sched�de and budgct, our sen ices have bcen eucuted in �ccord:ncc ��ith I <br /> ; gencrall� acceptcd practices in the tield of geotechnical cn�inecrine in this are:� a.the time this rcport �vns <br /> I prcparcd. No warranty or othcr conditions, c�press or implicd, should br undcrstood. <br /> � Aip� elecu'unic form, f:�csimile or hard cop� uf the original document (email. text. tabie. and/or ligure), if <br /> I provided, anJ any au:ichments are only a copy of[he original documen[. The original documen[ is stured <br /> b� GcoLneincers, Inc. .md ��'ill serve as dte oC�icial document of record. <br /> iPle,�se relcr to :lppendis D. "Repur! Limita[iuns' and Guidelines for Use" for additional information <br /> pertaining tu usc of this rcport. <br /> � �V'e uppreciate the opportuniry to peiticip�te on this project. Should ��ou ha��e nny questions concerning <br /> t:iis rcpart ur if��c can bc o(.idditionul scr��icc. plcasc call. <br /> il <br /> � <br /> ' <br /> I r:k>�,, iu-;��-n,��_,�o Pa,e 19 GeaEr+ciHeens� <br /> I �:��;u,r 1.Y. :mio <br />
The URL can be used to link to this page
Your browser does not support the video tag.