My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
Geotech Report
>
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:03:57 PM
Creation date
12/26/2019 8:33:55 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � APPENDIX C <br /> GROUND ANCHOR LOAD TESTS AND SHORING MONITORING PROGRAM <br /> � GROUND ANCHOR LOAD TESTING <br /> � General <br /> fhe locations of dic luad tests shall bc approced b}' the I:ncineer and shall bc representatice of the fleld <br /> condi�ions. Lond tests shall not be peribrmed until [h� n;iiVtieback grout and shotcret� wall �:icing. where <br /> � present, h;ice uttained u[ Ieast 50 percent of the spccified 23-dny compressive strengdts. <br /> \1`hcrc Icmpor:in� cusin�� ��f ihc uuhnndcd I�neth o' te�t nails!tiebncks is prm�ided. thc c:isinu shall bc <br /> � installcd io pr��rnt inicracti�,n 6ct���ccn thc bondcd Icn�rth of thc nuil�tich;�ck und thc casims�lestinc <br /> app:iratus. <br /> Thc resting ct�uipmcnt sh;ill inclu�l� t��o di;il _agr, ;iccur;uc tu 0.001-ineh, a di:il ��:i;c support. :i <br /> Icalibratcd jack and prc,surc _;iec. ;i pump, and thc luad tcst rc;ictiun fr;mi�. fhr di;il uagc shuuld bc <br /> t aliened ��ithin � degrecs of thc lom�itudinal naiUticback a�is and shall b�. indep�ndenth supported of thc <br /> load frame!j;icl: and thc shorin, wall. Che hydraulic j.tek. pressurc _age anJ pump �hall be used w applc I <br /> { and mcasurc ihc tcst load,. ' <br /> I <br /> 1'he jack und prcssurc eage shall bc calibr.ited by an independent testim� labor.ttory as a unit. l hc <br /> � pressure ga��c shall be ��r;iduatcd in IOU psi inerements or less and shall ha�e a ramee no� exccedim� hvicr <br /> � the :mticipated masinnim p�essw'e Juring testinc unless approved bv ihe Gngineec The ram tracel uf the <br /> juck shall be sufficient to enablr the tes[to be perfbnned witlwut re-positiuning thejnck. <br /> i Tlw jack shall bc indcpendentl� supporred :md ccntercd o��r thc naiUtichack so that thc n�iiUtieback docs <br /> nut carry thc wcight of the.jack. l he j;uk. bc;uing plates. and �ues'sin�: :mchora�,c shall be ali��ned with <br /> thc naiUticback. l�hc initial positiun cf thc jack sh;�ll bc such that m-posi[ionin� uf die jxk is not <br /> � ncccssary during thc load test. <br /> Thc rc:iction tiamc should be designed/sized such that excessi�c dcllcction nf the test apparatus ducs nut <br /> � occur and that the tcstim�app�u':uus does not necd ro bc repositioned duriu�: !ne IoaJ test. II thc rcaction <br /> j fr.�mc hears directl�� on the shorine wt�ll facim�. the rc�ctiun �i'atuc should be desigeeJ w nut d.unugc tlre <br /> facim_. - <br /> i <br /> Verification Tests <br /> Prior to productiun suil n:ul ticbaek installau���. -' Ieast t���o suil nails/ticback, for each soil rype shall be <br /> � irstcd to validate the dcsi�n pulluut ��aluc. ,�II test n.�il5'ticbacks sh;ill be instalkd by the same methuds. <br /> � ,crsonnel, material. and a ui iment as thc i �duction anchors. Chviees in mctltuJs, personncl, matcrial. <br /> I 1 1 P'` <br /> or equi��ment m.�y rcquirc ;�.Idition;il vcriticntion �cstine ns Jetermined b�' the [nginccr. At Ic:�st t��'o <br /> � successlul varilicatiun tests shall be performed for exh installation method and each soil tvpe. �ihe <br /> � nail�iticbacks u�ed �ur the �uitication tests ntay bc used as prodtre[iun nails�[icbacks if appru�'ed by the <br /> L:nCineef. <br /> Pur soil nails, thc unbonded len�,th of th� o.st n:�ils sh,ill bc a[ Icast 3 t�et unless approved othrn�isc by <br /> the [n_incec 'Thc bund Icneth of du test nails sh:dl not be less dian 10 (eet and shall not be lor,gcr d�an <br /> ihu bond Iength thn[ ��'ould prc��ent testing to 300 percen[ uf thc desi��n loud while not exceeding d�e <br /> ❑Ilo��abic bar luad. 'I�h� ;�Ilo��'able b;u' load durin� tes[im� shall not escee�l 30 percent uf the iteel ultimatc <br /> ;ucn�th for Gradc I:0 bars' or 90 percent of the stcel u!timate sn'cn�th fbr Grade 60 and 7� bars. l�he <br /> :illu����blc licb:uk IuaJ shuuld nut estecJ SO percent uf the sieel ultimate strenuth. <br /> � ,%�i;;� Ai, l0��8-rI0:-�r0 /'11�CC-I GEOENGINf,EflS� <br /> JucPis!l�Y. _0�)G <br />
The URL can be used to link to this page
Your browser does not support the video tag.