My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
Geotech Report
>
1818 13TH ST PEMC Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:03:57 PM
Creation date
12/26/2019 8:33:55 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> � Optical Survey <br /> � I�he shorine moniturinu pro�r;mi shauld ineluJe un optieal sun�r�� monitorin� proerum. �I�he <br /> mcommended freyuenc�� of monitonm� should �.�rv .0 :� �iinction of the sta��� of constniction as presentcd <br /> in thc fullo�vinu t:�blc: <br /> IConstruction Stage _� Monitoring Frequency <br /> During excavation and until wall movements have stabilized � Twice weekly <br /> I �Dunng excavation rf lateral wall movements exceed 1 mch antl�until i � Dady� <br /> wall movements have stabil¢ed <br /> .. ...._._. ..._. ______ — __ _ . . .._ ._ . . . <br /> Afler excavalion is complete/wa!I movements have stabdized and prior Twice monthly <br /> to Ihe fioors of!he building reaching the top of the excavation <br /> I �luniturim, shuuld includc vertical and horizontal survcy mcasurements accurate N at leas[ 0.01 ie�t. <br /> r� basclinc rcadine of the monitoring points shotdd be comple[ed priur [o beeinning shorin� installation. <br /> II'hc survcy daci should bc providcd to GcoGnginccrs for revic�v within 2d hours. <br /> Por shorine walls, �ve recomm�nd that optical survey points be established along the top uf the shurine <br /> � walls, at dic curb bchind thc nurth und south ���alls, and on existinu buildines Iocatcd ��ithin a horirontal <br /> dis[:mce of the shoring �valls equal to (hc hci�hi uf the wall. The su�-cy poinu should be spaced ecery <br /> 3� fcet alung thc ���ull facc and dic points ❑long thc curb linc/c�istin�� buildin�s should bc locntcd <br /> I immeJi:itcly bchind thc points along the top of[he �t'all. :ldditional survey puints should also be installed <br /> ;u mid-hcieh[ of the �vall as Ihc e�c:natiun proeresscs if lateral movements e�cecd 1 inch, at the sa�nc <br /> spacing as the points ;ilong Ihe top of the wull. If larerol �call movcmcnts :�m obscn'ed to be in e�cess of <br /> � '/_ inch behveen successive readings ur il total �eull mo�ements a�ceed I inch. consvuctiun of the shoring <br /> «�alls should bc stopped Iu dctvrminc the cnu;e ol th� n�u��cmcnt und to csmbli;h thc t��pc and c�tcnt o( <br /> rcmcdi:tl mcusures ryuired. <br /> I <br /> i <br /> i <br />� <br /> I l�ii,�C.� iU",1��1U�-UU Pa];dC-d GEDENGINEERS� <br /> .-IuGu.v i�1. :0Uo <br />
The URL can be used to link to this page
Your browser does not support the video tag.