Laserfiche WebLink
r <br /> ARCHRECTURAL PLANS REVIEW Cp►y�MENTS <br /> RiChard M. Swan�on <br /> Phone: (350)705-6782 , <br /> Fex: (360)705-6654 <br /> Net: RMS0303�hub.doh.we.gov <br /> FACILITY: CASCADE BIRTH�ENTER <br /> PROJECT: Proposed Birth Center <br /> C RSIf: 99-9791-5467-001 <br /> DATE: May 17, 1999 <br /> 1. Show on the plan where equipment required by WAC 246,929-070(1)(g)will be stored and <br /> describe what equipment will be prov(ded to maintein e newbom's opHmum body <br /> temperature. <br /> 2. Describe conshuction ot the medicine boxes(particle boerd is not albwedl end how ihey <br /> and the refrigerator will provide secured storage. WAC 246-329•090(� <br /> 3. Show how the do�r to the birthing room(s)will provide adequate space to accommodate <br /> manewering of an ambulance stretcher. WAC 246-329-100(7) ' <br /> 4. Coordinate the intormetlon provided in the tunctional program on heater IocaHons with the <br /> intortnation shown on the plans. Justify that the one heater shown on the pian will mefntain <br /> a temperature oi at least 72 degrees. WAC 248-329-100(9)(a) <br /> 5. Provide informatlon on the capacity oi the fan in the birth room showing it will exhaust air(n <br /> a sutticient quantity as if the birthing room is a bath room because of the location of the tub. <br /> WAC 246•329-100(9)(b) <br /> 6. Show/note how the facility will provide adequate examination Iights in the birthing room. <br /> wnc 2as-s2s-�oo�io��t� <br /> 7. Locate on the plan a janitor's closet with a mop sink. WAC 246�29-100(12)(a) <br /> END OF REVIEW COMMENTS <br />► <br />