My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2825 COLBY AVE COLBY CENTER Geotech Report 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2825
>
COLBY CENTER
>
Geotech Report
>
2825 COLBY AVE COLBY CENTER Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:05:26 PM
Creation date
12/30/2019 11:20:38 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2825
Tenant Name
COLBY CENTER
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, � I <br /> ; Existing First ; <br /> � Interstate Bank ; <br /> �----------------� W <br /> W � <br /> � Proposed Z <br /> Z Ramp Down to Parking W <br /> � a W <br /> __ °° a � <br /> VPropused Parking Area � <br /> � -: 3 <br /> � B-1 ' <br /> Proposed Building <br /> � <br /> i <br /> 1 <br /> '` HEWITT AVENUE <br /> � <br /> � �. <br /> + �FG�°� � <br /> 1 <br /> I �-1 -j- Approximate Locafion of qpproxtmace Scale <br /> ECI Boring, Proj. No. <br /> E-6225, July 1993 0 �5 3o soa• <br /> I � Proposed Building <br /> � Reference: <br /> Flrst Floor Plan <br /> By The Dykeman Archkects <br /> Undated <br /> IBoring Location Plan <br /> I Earth COI'1SUltat'1tiS IIIC. Colby Center <br /> �•F^�°�°'°�"•�""""'"""""""' Everett, Washington <br /> � ProJ.No. 6225 Drwn. GLS D�N July'93 Che.:ked AM Date 7/16/93 Pl�t� 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.