My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2825 COLBY AVE COLBY CENTER Geotech Report 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2825
>
COLBY CENTER
>
Geotech Report
>
2825 COLBY AVE COLBY CENTER Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:05:26 PM
Creation date
12/30/2019 11:20:38 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2825
Tenant Name
COLBY CENTER
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� �f � / �'�I. <br /> I � ��r� Earth Consultants Inc. <br /> � <br /> —' l\ �� AI%I (av4}linv-:tll'nRirnv�r�.levppli�cdfnnn��nvnial�inw�U <br /> '�. <br /> July 27, 1993 E-6225 I <br /> — Mr. Arthur Skotdal <br /> clo Dykeman Architects <br /> 400 First National Bank Building <br /> — 1602 Hewitt Avenue <br /> Everett, Washington 98201 <br /> — Attention: Mr. Chuck Ogden <br /> Gentlemen: <br /> We are pleased to submit our report titled "Geotechnical Engineering Study, Proposed <br /> Colby Center, Colby and Hewitt Avenue, Everett, Washington." This report presents the <br /> - results of our field exploration, selective laboratory tests, and engineering anaiyses. The <br /> purpose and scope of our study was outlined in our June 9, 1993 proposal. <br /> { Based on the results of our study, it is our opinion, the proposed building can be ' <br /> � constructed on conventional foundations as planned. The most critical geotechnical <br /> issues to be addressed are completing the pianned parking level excavation using an open <br /> �� cut method or temporary shoring. Due to the dense condition of site soils, it would be <br /> � feasible to mz3ke a steeply inclined open cut provided that a portion of the existing <br /> side�valk or asphalt parking area can be removed. The second major aspect of site <br /> earthwork involves filling the former east building basement planned for street grade <br /> parking, while providing adequate trainage above the existing slab which will be located <br /> below the new fill. <br /> I We appreciate this opportunity to have been of service to you during this initial phase of <br /> project development, and we look forward to working with you in the future. Should you <br /> or your consultants have any questions about the content of this report, or if we can be <br /> of further assistance, please call. <br /> ' Very truly yours, <br /> I EARTH CONSULTANTS, INC. <br /> I �/ <br /> � � <br /> ', .�iL�-,�c.�-� <br /> Ro e ... Levinson, P. E. <br /> Principal "�^�^�' <br /> — 1805� 1361h Place N.E.,Suile 201, Bellevue,Washing�on 98005 <br /> 1 222 E.261h Streel,Suite 103,Tacoma,Washinglon 98421�9998 <br /> Bellevue(206)6433780 Sealtle(206)464�1584 fAX(206)746 086D Tacoma(206)2?2 6608 <br />
The URL can be used to link to this page
Your browser does not support the video tag.