My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2828 COLBY AVE OPUS BANK 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
2828
>
OPUS BANK
>
2828 COLBY AVE OPUS BANK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 10:25:06 AM
Creation date
12/30/2019 3:52:39 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2828
Tenant Name
OPUS BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: 11/14/2014 <br />Public Works Permit #: PW 1411-021 <br />Building Permit#; <br />Planning Reference #: <br />Public Works Fee $: $ 120.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />INTEGRAIJOHN NICHOLSON G&L UITILITY, CONTR. INC. <br />1303 120th AVE NE P.O.BOX 3430 <br />BELLEVUE WA 98005 REDMOND WA 9B073 <br />PHONE: 2068123358 PHONE: 3604021900 <br />TAX PARCEL 10 # SITE ADDRESS: 2828 COLBY AVE <br />DESCRIPTION OF PROPOSED WORK: <br />OPEN CUT <br />(11/1412014 10:33 AM BES) <br />OPEN CUT AND INSTALL 1-2" PVC BACK OF 2828 COLBY <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall bm� performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 F- <br />4 Any damage to sidewalk, driveway tec.. should be replaced per City of Everett Standards. <br />5.Traffic control should be per approved drawings 11110/2014. <br />6. There should be at least a minimum of 5'(five feet) seperation between City of Everett utilities and fiber cable <br />7. Contractor must contact City of Everett Inspector o <br />Randy Allen 425-339-7403 prior to starting construction. F <br />r <br />h <br />F� r, <br />808 <br />c� roman <br />, -. E:S <br />nr <br />tM <br />Fit <br />C <br />F--a <br />0 <br />C) <br />PLO <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damage thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION, THIS PERMIT MAYBE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PRO]ECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.