Laserfiche WebLink
(6) CB 1309-35 — 2nd Reading — Adopt the Proposed Ordinance closing a special <br /> improvement project entitled, "Parcel C- Road and Intersection Improvements," <br /> Fund 308, Program 005, as established by Ordinance No. 3174-10 (3rd and final <br /> reading on 10-16-13) <br /> CONSENT ITEMS: <br /> (7) Adopt Resolution No. authorizing claims against the City of Everett in the <br /> amount of $2,646,882.70 for the period of September 14, 2013 through <br /> September 20, 2013 <br /> (8) Adopt Resolution No. authorizing payroll claims against the City of Everett <br /> in the amount of $1,197,848.11 for the period ending September 21, 2013 <br /> (9) Adopt Resolution No. authorizing electronic transfer claims against the City <br /> of Everett in the amount of $6,448,619.22 for the period of August 1, 2013 to <br /> August 31, 2013 <br /> ACTION ITEMS: <br /> (10) Authorize the Mayor to sign the Equipment and Rental Contract with Enviro- <br /> Clean Equipment, Inc. at no cost to the City <br /> (11) CB 1309-31 — 3rd and final Reading- Adopt the Proposed Ordinance closing the <br /> West Marine Parking Lot, Fund 342, Program 015 and transfer the remaining <br /> balance of $58,079 to CIP 4 <br /> (12) CB 1309-32 — 3rd and final Reading- Adopt the Proposed Ordinance closing a <br /> special improvement project entitled "Rucker-Hoyt Streetscape Project," Fund <br /> 303, Program 090, as established by Ordinance No. 3189-10 <br /> (13) Authorize the Mayor to sign the 2013-2014 Memorandum of Understanding with <br /> the Washington Traffic Safety Commission regarding participation in high <br /> visibility enforcement traffic safety emphasis patrols <br /> (14) Authorize the Mayor to sign the 2013-2014 Interlocal Agreement with Snohomish <br /> County for sex offender address and residency verification program services <br /> (15) Authorize the Mayor to sign Amendment No. 2 to the Professional Services <br /> Agreement with Jacobs Engineering Group Inc. for the "Sewer System <br /> Replacement and Capacity Improvements "M" Project and Puget Sound Outfall <br /> #3 (PS03) replacement" in the amount of $275,572.00 <br /> (16) Authorize the Mayor to sign the "Transfer of U.S. Army Corps of Engineers <br /> Authorization" for Permit # NWS-2010-00089 for the Riverfront Development <br />