My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/10/16 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/10/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:28:11 AM
Creation date
12/31/2019 11:22:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/16/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. i <br /> Run Date: 3/29/2013 • City of Everett-Public Works Department Cutoff Date: 3/15/2013 <br /> Time: 3:04 PM Contract Estimate Voucher • <br /> Project: 292 For Work Order#34683 Contractor: Granite Construction <br /> HMA Overlay 2012 Estimate#5 PO Box 742478 <br /> WO 3468B BID:$214,800.00 Los Angelos,CA 90074 <br /> TOTAL BID:$1,509,885.00 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Mobilization LS 16,532.00 1.00 1.0000 1.0000 0.0000 16,532.00 16,532.00 0.00 <br /> • <br /> 0003 Temporary Traffic Control LS 1,468.00 1.00 1.0000 1.0000 0.0000 1,468.00 1,468.00 0.00 <br /> 0005 Commerical HMA TN 60.00 3,280.00 2,506.2000 0.0000 2,506.2000 150,372.00 0.00 150,372.00 <br /> Work Order Totals: 168,372.00 18,000.00 150,372.00 <br /> 09 <br /> J <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.