My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/10/23 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/10/23 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:38:43 AM
Creation date
12/31/2019 11:36:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/23/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i..,� 43 . <br /> DEPARTMENT OF <br /> ECOLOGY <br /> • State of Washington <br /> AMENDMENT NUMBER 3 <br /> • <br /> TO GRANT NUMBER G0900083 <br /> REMEDIAL ACTION GRANT BETWEEN <br /> STATE OF WASHINGTON DEPARTMENT OF ECOLOGY <br /> AND THE • <br /> CITY OF EVERETT <br /> Purpose: The purpose of this amendment is to add funds and increase the scope of work by the <br /> addition of two tasks(Task 5 and Task 6), and to extend the expiration date of the agreement. <br /> It is mutually agreed that the agreement is amended as follows: <br /> 1. The total maximum eligible cost for this agreement increases by$1,000,000 from $3,775,332 <br /> to $4,775,332. <br /> 2.The state share for this agreement increases by$500,000 from $1,887,666 to $2,387,666. <br /> 3. TASK 5 is added as follows: <br /> TASK 5 SANITARY AND STORMWATER SYSTEM IMPROVEMENTS • <br /> This task funds RECIPIENT costs ECOLOGY considers reasonable and necessary to <br /> construct improvements to the site's stormwater control system and provide connections for <br /> sanitary sewer. Eligible costs include those needed for the design and construction of the • <br /> stormwater discharge connections and treatment locations, and sanitary sewer connections. <br /> 4. TASK 6 is added as follows: <br /> TASK 6 EASTERN PERIMETER LANDFILL GAS COLLECTION SYSTEM <br /> This task funds RECIPIENT costs ECOLOGY considers reasonable and necessary to design <br /> and construct an extension to the existing landfill.gas system along the eastern perimeter of <br /> the landfill adjacent to the leachate collection system. <br /> Page 1 of 3 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.