My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/10/30 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/10/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2019 11:49:58 AM
Creation date
12/31/2019 11:47:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/30/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Exhibit A <br /> Clearview Pump Station / City of Everett Data Sharing <br /> This is to describe methods and data to be shared between CVPS and COE. <br /> Method <br /> Establish communications between COE RTU and CVPS System..This can be accomplished <br /> at CVPS between RTU's at that site via an agreed upon method that is reliable and secure for <br /> both parties. <br /> • Method 1: Via Hardwire signaling between devices, example PLC output to PLC input. <br /> • Method 2: Via Data block transmission through a secured serial port server (Lantronix) <br /> (MODBUS Register blocks exchange on comm.server and no direct access to network <br /> or PLC registers). <br /> Method 1 is preferred. <br /> Data update frequency shall be determined by normal SCADA system transmission methods <br /> and is dependent on 3rd party communications lines. Scan time will be as fast as media can <br /> provide for reliable transmission. <br /> Data from Clearview Pump Station to COE <br /> Discrete Signals (Method 1) <br /> 1. Check valve ZAC-702,85 or position switch bypass valve closed (not) ZAC-703,87 <br /> 2. Pump 1 run YI-100 <br /> 3. Pump 2 run YI-200 <br /> 4. Pump 3 run YI-300 <br /> 5. Pump 4 run YI-400 <br /> 6. Pump 5 run YI-500 <br /> 7. CVPS FQ707 inlet meter pulse <br /> 8. CVPS Station power status: online or offline <br /> Analog Data Signals (Method 1) <br /> 1. CVPS Station flow rate FIT707 (Inlet meter) <br /> 2. CV Reservoir#1 L1-101 • <br /> 3. CV Reservoir#2 L1-102 <br /> Digital Signals (Method 2) <br /> 1. CVPS RTU clock seconds for determining communications Watchdog <br /> 2. (signals that are provided Discrete and via Analog) <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.