My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3202 COLBY AVE DR SALAMA 2018-01-02 MF Import
>
Address Records
>
COLBY AVE
>
3202
>
DR SALAMA
>
3202 COLBY AVE DR SALAMA 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 9:12:59 AM
Creation date
1/2/2020 8:58:15 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
3202
Tenant Name
DR SALAMA
Notes
CLINIC MEDICAL OFFICE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> � <br /> I <br /> � � <br /> IO � C �,'AFa. � ' <br /> C H � <br /> Y N N <br /> M � T. <br /> y 1n-i <br /> � H 'A <br /> O C O <br /> � M �Q <br /> y H <br /> � H � <br /> °� � Plan Check No. 92/36134 <br /> � , � Page Two of Two <br /> � y � II. The following items pertain to the structural modification <br /> � y drawinqs prepared by Peter Schroeder Architects. <br /> C N <br /> � � ro 1. Indicate draftstops per Section 2516.4.B(iii) . <br /> O y <br /> `� 2. Indicate roof access per IIniform Mechanical Code Section <br /> 71o(h) . <br /> 3. Provide structural calculations to verify existing first <br /> floor beam load capacity under new off-set columns. Please <br /> also provide a column base to beam/floor detail. <br /> 4. Provide a detail of B1 to header connection. <br /> 5. The western support column for B6 (near B5) is shown <br /> hearing on a new footing. This footing appears to be on top <br /> of the existing basement wall. Please clarify. <br /> I���` 6. Please clarify footing support for 3-2x columns supporting <br /> B4 and B2. <br /> � � 7, A section of bearinq wall south of B6/B5 intersection is <br /> ��� shown as being removed. Please clarify support of 2r.10 @ 16" <br /> � o.c. roof framing. Also please clarify a similar condition <br /> ' at the south side of the building. <br /> In order for the processing of your application to continue, it ' " ' �^'� <br /> � �"� will be necessary to provide the Buildiny Department with two <br /> complete new sets of drawings reflecting the corrections <br /> requested. <br /> ��w <br /> �. Upon re-submittal of the drawings, your application will be given <br /> priority and plan review recommence. <br /> ' All required submittals shall be af sufficient detail and contain <br /> �� sufficient inPormation to en�ure that the proposed structure will <br /> I � <br /> be constructed in compliance with all adopted codes. <br /> ; <br /> � Since , <br /> I ��� �. i �� <br /> � I <br /> e S. M all <br /> Asso iate E gineer/Building ' <br /> plenck/[rabtree � � �! <br /> "�i��i <br /> , .����::=� S <br /> � R,�. <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.