Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 2 <br /> PROJECT TITLE: <br /> Public Works Sewer M Project X Briefing COUNCIL BILL# <br /> Update Proposed Action Originating Department Public Works <br /> Consent Contact Person Dave Davis <br /> Action Phone Number 425-257-8913 <br /> First Reading FOR AGENDA OF Dec. 4,2013 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Amount Budgeted -0- <br /> Expenditure Required -0- Account Number(s): <br /> Budget Remaining • -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Staff will present an overview of the upcoming Sewer M Project which includes 10th Street through 19th <br /> Street and Grand Avenue through Wetmore Avenue. The project will replace and upsize dated sewer mains <br /> as well as fully separate the surface storm water from the sewer system. Side sewer backflow valves and <br /> voluntary residential down spouts disconnection are additional elements of the project. The$13.5M project <br /> is scheduled for construction from summer 2014 through summer 2015. Additionally, staff will present the <br /> replacement for Puget Sound Overflow#3. <br /> RECOMMENDATION(Exact action requested of Council): <br /> 2 <br />