My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013/12/24 Council Agenda Packet
>
Council Agenda Packets
>
2013
>
2013/12/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 11:51:30 AM
Creation date
1/2/2020 11:49:19 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/24/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 6 <br /> a <br /> PROJECT TITLE: <br /> Professional Services Briefing COUNCIL BILL# <br /> Agreement with Parametrix for Proposed Action Originating Department Public Works <br /> Stormwater Planning and Consent Contact Person Heather Griffin <br /> Design along Evergreen Way Action Phone Number (425)257-7206 <br /> First Reading FOR AGENDA OF Dec. 24,2013 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Evergreen Way 11/6/13 Ecology PSA Public Works <br /> Municipal Stormwater <br /> Capacity Grant <br /> Amount Budgeted $270,000 <br /> Expenditure Required $268,000 Account Number(s): 401 <br /> Budget Remaining $2,000 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The proposed Professional Services Agreement(PSA)with Parametrix creates a master plan for Evergreen <br /> Way water quality retrofits to provide consistency along the corridor for future redevelopment and <br /> transportation projects in accordance with the Evergreen Way revitalization plan(Council adopted 4/12/12). <br /> Additionally,the PSA will prepare plans and specifications for drainage improvements and water quality <br /> retrofits at Madison and Evergreen Way intersections where past flooding has occurred. <br /> Funding for the PSA is provided through an Ecology grant($120,000) and Utility Funds. <br /> RECOMMENDATION: <br /> Authorize the Mayor to sign the Professional Services Agreement with Parametrix for Stormwater Planning <br /> and Design Services along Evergreen Way in the amount not to exceed$268,000. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.