Laserfiche WebLink
6 <br /> • Prepare 90%plans,specifications and cost estimate. <br /> • Conduct an independent constructability review. <br /> Deliverables: The following deliverables will be prepared: <br /> • Constructability Review Memorandum <br /> • 90%Plans <br /> • 90%Specifications <br /> • 90%Cost Estimate <br /> Assumptions: The following assumptions apply to this task: <br /> • A 60%submittal will not be prepared. <br /> • City will prepare"front end"specification information. Parametrix to incorporate the <br /> front end documents into the specifications for the 90%submittal. <br /> Task 6 Final Bid Documents <br /> Objective: To prepare final bid documents and advertisement to be used by the City. <br /> Activities: The following activities are associated with this task: <br /> • Prepare final plans, specifications, and cost estimate ready for bidding that <br /> incorporates input from the City. <br /> Deliverables: The following deliverables will be prepared: <br /> • Final Plans <br /> • Final Specifications <br /> • Engineering Estimate <br /> Assumptions: The following assumptions apply to this task: <br /> • City will provide 90%comments including on the Parametria constructability review. <br /> PHASE 03 EVERGREEN WAY CONCEPTUAL MASTER PLAN FOR WATER QUALITY <br /> RETROFITS <br /> Task 1 Background and Existing Data <br /> Objective: Secure existing data related to As-Bats, Survey,Right-of-Way, GIS, Utilities,Flooding <br /> Incidents,History,City Design&Controls Standards,etc. <br /> Activities: The following activities are associated with this task: <br /> City of Everett <br /> S'tormwater Quality Retrofits Evergreen Way 236-1844-821 <br /> 133 <br /> 40 <br />