Laserfiche WebLink
Run Date: 6/19/2019 City of Everett-Public Works Department Cutoff Date: 6/21/2019 <br /> Time: 3:24 PM Contract Estimate Voucher <br /> Project: 365 For Work Order#3684A Contractor: INTERWEST CONSTRUCTION <br /> WATERMAIN REPLACEMENT"T" Estimate#6 609 NORTH HILL BOULEVARD <br /> WO 3684A BID:$2,056,479.00 BURLINGTON,WA 98233 <br /> TOTAL BID:$2,112,653.00 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantify Quantity Quantity Quantity Amount Amount Amount <br /> 0001 MOBILIZATION LS 104,000.00 1.00 1.0000 1.0000 0.0000 104,000.00 104,000.00 0.00 <br /> 0002 SURVEYING LS 15,000.00 1.00 1.0000 1.0000 0.0000 15,000.00 15,000.00 0.00 <br /> 0003 SPCC PLAN LS 1,050.00 1.00 1.0000 1.0000 0.0000 1,050.00 1,050.00 0.00 <br /> 0004 FORCE ACCOUNT FA 1.00 70,000.00 19,783.5200 19,783.5200 0.0000 19,783.52 19,783.52 0.00 <br /> 0005 TRAFFIC CONTROL LABOR HR 57.00 2,900.00 4,388.5000 4,388.5000 0.0000 250,144.50 250,144.50 0.00 <br /> 0006 TRAFFIC CONTROL-OFF DUTY POLICE FA 1.00 8,700.00 8,463.9300 8,463.9300 0.0000 8,463.93 8,463.93 0.00 <br /> OFFICER <br /> 0007 MAINT&PROTECTION OF TRAFFIC LS 65,000.00 1.00 1.0000 1.0000 0.0000 65,000.00 65,000.00 0.00 <br /> CONTROL <br /> 0008 TRENCH EXCAVATION SAFETY SYSTEMS LS 2,500.00 1.00 1.0000 1.0000 0.0000 2,500.00 2,500.00 0.00 <br /> 0009 STREET CLEANING&SWEEPING HR 165.00 84.00 21.5000 21.5000 0.0000 3,547.50 3,547.50 0.00 <br /> 0010 EROSIONIWATER POLLUTION CONTROL FA 1.00 3,000.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0011 SAWCUT ASPHALT CONCRETE PAVE, LF 2.20 12,970.00 17,216.0000 17,216.0000 0.0000 37,875.20 37,875.20 0.00 <br /> FINAL JOINT TO 6" <br /> 0012 SAWCUT ASPHALT CONCRETE PAVE LF 0.55 10,280.00 16,411.0000 16,411.0000 0.0000 9,026.05 9,026.05 0.00 <br /> FINAL JOINT <br /> 0013 SAWCUT CONCRETE PAVE FINAL JOINT LF 4.40 10,580.00 13,864.0000 13,864.0000 0.0000 61,001.60 61,001.60 0.00 <br /> CUT UP TO 6" <br /> 0014 SAWCUT CONCRETE CURB&GUTTER& LF 4.40 660.00 861.0000 861.0000 0.0000 3,788.40 3,788.40 0.00 <br /> SIDEWALK <br /> 0015 FOUNDATION MATERIAL CLASS A OR B TN 52.00 800.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0016 GRAVEL BORROW TN 29.00 2,040.00 689.3900 689.3900 0.0000 19,992.31 19,992.31 0.00 <br /> 0017 DUCTILE IRON PIPE FOR WATERMAIN 4" LF • 120.00 245.00 246.0000 246.0000 0.0000 29,520.00 29,520.00 0.00 <br /> 0018 DUCTILE IRON PIPE FOR WATERMAIN 6" LF 160.00 300.00 399.0000 399.0000 0.0000 63,840.00 63,840.00 0.00 <br /> 0019 DUCTILE IRON PIPE FOR WATERMAIN 8" LF 93.00 4,248.00 4,297.0000 4,297.0000 0.0000 399,621.00 399,621.00 0.00 <br /> 0020 DUCTILE IRON PIPE FOR WATERMAIN 12" LF 116.00 1,065.00 1,065.0000 1,065.0000 0.0000 123,540.00 123,540.00 0.00 <br /> 0021 GATE VALVE,4" EA 1,050.00 4.00 8.0000 8.0000 0.0000 8,400.00 8,400.00 0.00 <br /> 0022 GATE VALVE,6" EA 1,200.00 13.00 18.0000 18.0000 0.0000 21,600.00 21,600.00 0.00 <br /> 0023 GATE VALVE,8" EA 1,640.00 17.00 21.0000 21.0000 0.0000 34,440.00 34,440.00 0.00 <br />