Laserfiche WebLink
Run Date: 6/19/2019 City of Everett-Public Works Department Cutoff Date: 6/21/2019 <br /> Time: 3:24 PM Contract Estimate Voucher <br /> Project: 365 For Work Order#3684B <br /> Estimate#6 Contractor: INTERWEST CONSTRUCTION <br /> WATERMAIN REPLACEMENT"T" 609 NORTH HILL BOULEVARD <br /> WO 36846 BID:$56,174.00 BURLINGTON,WA 98233 <br /> TOTAL BID:$2,112,653.00 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0049 MOBILIZATION LS 5,000.00 1.00 1.0000 1.0000 0.0000 5,000.00 5,000.00 0.00 <br /> 0050 SURVEYING LS 2,500.00 1.00 1.0000 1.0000 0.0000 2,500.00 2,500.00 0.00 <br /> 0051 SPCC PLAN LS 600.00 1.00 1.0000 1.0000 0.0000 600.00 600.00 0.00 <br /> 0052 FORCE ACCOUNT FA 1.00 4,000.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0053 TRAFFIC CONTROL LABOR HR 57.00 160.00 135.0000 135.0000 0.0000 7,695.00 7,695.00 0.00 <br /> 0054 LANDSCAPE RESTORATION LS 10,000.00 1.00 1.0000 1.0000 0.0000 10,000.00 10,000.00 0.00 <br /> 0055 BEAM GUARDRAIL TYPE 31,8'LONG POST LF 74.00 150.00 170.0000 170.0000 0.0000 12,580.00 12,580.00 0.00 <br /> 0056 BEAM GUARDRAIL NON-FLARED TERMINAL EA 3,600.00 2.00 2.0000 2.0000 0.0000 7,200.00 7,200.00 0.00 <br /> 0057 MUKILTEO BOULEVARD UTILITY LS 6,654.00 1.00 1.0000 1.0000 0.0000 6,654.00 6,654.00 0.00 <br /> CONFLICTS <br /> Work Order Totals: 52,229.00 52,229.00 0.00 <br />