My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
>
Contracts
>
Capital Contract
>
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 9:54:31 AM
Creation date
1/3/2020 9:54:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc (ICI)
Approval Date
12/2/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
18
Tracking Number
0000801
Total Compensation
$23,500.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> BUS WIRES <br /> 16 AWG nickel-plated copper <br /> BRAID/OUTER JACKET <br /> Tinned-copper braid with modified po olefin jacket(-CR)or fluoropolymer <br /> jacket(-CT). <br /> DIMENSIONS <br /> 5XL and 8XL 12XL <br /> Maximum width 0.56 in(14 mm) 0.62 in(16 mm) <br /> Maximum thickness 0.24 in(6 mm) 0.24 in(6 mm) <br /> NOMINAL WEIGHT <br /> 92 lb/1000 ft 104 lb/1000 ft <br /> CONNECTION KITS <br /> nVent RAYCHEM RayClic or FTC connection kits must be used with XL-Trace <br /> heating cables.Refer to the Pipe Freeze Protection and Flow Maintenance Design <br /> Guide(H55838)for proper connection kit selection. <br /> APPROVALS <br /> UL 718K Pipe Heating Cable SP� <br /> LISTED C US <br /> -W <br /> 41* <br /> APPROVED <br /> SP• <br /> C US <br /> -W <br /> Refer to the Pipe Freeze Protection and Flow Maintenance Design Guide(H55838) <br /> and the Fire Sprinkler Freeze Protections Design Guide(H58489)for specific <br /> product approval details. <br /> GROUND-FAULT PROTECTION <br /> To minimize the danger of fire from sustained electrical arcing if the heating <br /> cable is damaged or improperly installed,and to comply with the requirements of <br /> nVent,agency certifications,and national electrical codes,ground-fault equipment <br /> protection must be used on each heating cable branch circuit.Arcing may not be <br /> stopped by conventional circuit protection.Many nVent RAYCHEM control and <br /> monitoring systems meet the ground-fault protection requirement. <br /> nVent.corn 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.