Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
>
Contracts
>
Capital Contract
>
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 9:54:31 AM
Creation date
1/3/2020 9:54:07 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc (ICI)
Approval Date
12/2/2019
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Amendment/Change Order
Change Order
Amendment/Change Order Number
18
Tracking Number
0000801
Total Compensation
$23,500.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc. 7/24/2017
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERWEST <br /> CONSTRUCTION <br /> INC. <br /> October 18th, 2019 COP 021 <br /> Ken Kettel,Resident Engineer <br /> KBA/City of Everett <br /> 3101 Cedar Street <br /> Everett, WA 98201 <br /> RE: COP 021: Heat Trace for 12in Sanitary Sewer Force Main <br /> Grand Ave Pedestrian Bridge/PW 3588 <br /> Dear Ken: <br /> Interwest Construction, Inc. (Interwest) is providing this Change Order Proposal (COP) as <br /> requested to add a heat trace system to the project's 12in Sanitary Sewer Force Main(SSFM). This <br /> system was not included in the Contract as there are no specifications detailing the system, <br /> materials,measurement and/or payment. <br /> Interwest proposes to provide additional labor, equipment, and materials as detailed below to <br /> address the added work requested: <br /> • Supply and install a heat trace system per Electric West COP 09 to address the response to <br /> RFI 290 and Interwest's Serial Letter 051 dated August 2"d, 2019. <br /> Interwest's proposed price includes the following clarifications: <br /> • The material quotation is based upon a good faith estimated price for supply of a system <br /> up to the listed footage. Final system design will not be completed until a Change Order <br /> is authorized and therefore material cost will not be finalized until that time. Interwest and <br /> Electric West reserve the right to request additional compensation if material costs increase <br /> once the final design is completed. Any such request would be clearly presented with <br /> invoice documentation to substantiate the request. <br /> • No representation is made that the proposed system meets the Engineer's performance <br /> specifications set forth in RFI 290 response item #2. The manufacturer's input has been <br /> solicited but the Engineer is to determine if this system meets the Engineer's requirements. <br /> • A Buy America compliant product has not been found for this application but it is unlikely <br /> that the materials will contain significant amounts of foreign steel. If the designed system <br /> includes greater than the contractually allowed 0.01% foreign steel based on the value of <br /> this Change Order, the City is to fund this Change order in a manner that does not impact <br /> Interwest's contractually allowed foreign steel quantity for the Project. <br /> • Sales tax has been included on materials <br /> Interwest proposes the following pricing for these changed conditions: <br /> • Supply and install Heat Trace System $23,500.00 Lump Sum <br /> TOTAL $ 23,500.00 Lump Sum <br /> 609 N.Hill Blvd. Burlington,WA 98233 <br /> www.interwest.biz <br /> Ph: (360)757-7574 Fax:(360)757-7574 <br /> Contractor License INTERCI121 OF <br /> 1 of 2 <br />