Laserfiche WebLink
COP9 <br /> ELECTRIC WEST, INC. <br /> CHANGE ORDER PROPOSAL <br /> GAPB <br /> ICI <br /> Heat Trace of force main based on RAY-COM bill of material. <br /> Description: <br /> 1 DIRECT LABOR <br /> Job <br /> Classification Wage Rate Hours Cost <br /> Foreman 84.62 2 $169.24 <br /> JW 79.19 25 $1,979.75 <br /> Subtotal $2,148.99 <br /> Allowable mark up 29% $623.21 <br /> Total Labor Cost $2,772.20 <br /> 2 MATERIALS <br /> Description Quantity Units Unit Price Cost <br /> RAY-COM BOM 1 LS $12,404.32 $12,404.32 <br /> $0.00 <br /> $0.00 <br /> shipping 0 $0.00 $0.00 <br /> Use Tax 9.70% $1,203.22 <br /> Allowable mark up 21% $2,857.58 <br /> Total Material Cost $16,465.12 <br /> 3 EQUIPMENT Proposed <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> $0.00 <br /> Overhead&Profit 21% $0.00 <br /> Total Cost of Equipment $0.00 <br /> 4 SERVICES <br /> Description Rental Rates Time Cost <br /> $0.00 <br /> $0.00 <br /> Allowable mark up 21% $0.00 <br /> Total Cost of Services $0.00 <br /> 5 FORCE ACCOUNT MOBILIZATION $0.00 <br /> 6 SUBCONTRACTORS $0.00 <br /> 7 CONTRACTOR MARK UP ON SUBCONTRACTORS 12% $0.00 <br /> 8 ADDITIONAL CONTRACT DAYS REQUIRED 0 <br /> TOTAL COST OF PROPOSED CHANGE $19,237.32 <br /> Electric West reserves all contractual and legal rights to modify or supplement this Change Order to reflect <br /> additional cost or schedule impacts,and nothing herein shall be construed as a waiver of such rights. <br /> 10/11/2019 <br />