My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
>
Contracts
>
Capital Contract
>
Interwest Construction Inc (ICI) 12/2/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:10:18 AM
Creation date
1/3/2020 10:10:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc (ICI)
Approval Date
12/2/2019
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
Cleveland Avenue Sewer System Replacement
Public Works WO Number
UP3398
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001631
Total Compensation
-$28,583.75
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction Inc 2/8/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Cleveland Avenue Sewer System Replacement& Storm Water Separation <br /> Change Order No. 1 <br /> Change Order Effective Date: November 1, 2019 <br /> CONTRACTOR ' <br /> l� <br /> By Date: <br /> ct <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This change order#1 adds one new item to both schedules A&B and modifies one existing bid item <br /> on both schedules A&B of the Contract as follows: <br /> Schedule A: <br /> Modify existing bid item#11 -Foundation Material,by deleting 2,130 tons of foundation material,at <br /> the unit bid price of$22.00 per ton,resulting in a $46,860.00 credit to the contract price. <br /> Add new item#100 - Concrete Roadway Trench Patch,by adding 436.50 square yards of concrete <br /> roadway trench patch, at the agreed to unit price of$72.50 per square yard, resulting in a$31,646.25 <br /> contract price increase. <br /> Schedule B: <br /> Modify existing bid item#11 -Foundation Material, by deleting 2,440 tons of foundation material, at <br /> the unit bid price of$22.00 per ton,resulting in a$53,680.00 credit on the contract price. <br /> Add new item#100- Concrete Roadway Trench Patch,by adding 556.00 square yards of concrete <br /> roadway trench patch, at the agreed to unit price of$72.50 per square yard, resulting in a$40,310.00 <br /> contract price increase. <br /> The net result of adding one new item#100 to both schedules A&B and modifying one existing bid <br /> item#11 on both schedules A&B of the contract, results in a contract price reduction of($28,583.75). <br /> JUSTIFICATION: <br /> Existing bid item#11, for Foundation Material,were not needed on schedules A&B of the project. <br /> New items#100--Concrete Roadway Trench Patch,were needed on both schedules A&B of the <br /> project as existing roadway concrete panels were discovered underlaying existing asphalt on Summit <br /> and Everett Avenues,which were not accounted for in the contract documents. <br /> CONTRACT TIME: <br /> No additional days are added to the contract time as a result of change order#1. <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.