My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premier Field Development Inc 12/2/2019 Change Order 1
>
Contracts
>
Capital Contract
>
Premier Field Development Inc 12/2/2019 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2020 10:18:12 AM
Creation date
1/3/2020 10:18:04 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Premier Field Development Inc
Approval Date
12/2/2019
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Phil Johnson Ballfields Renovation
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0001860
Total Compensation
$91,714.23
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Premier Field Development Inc 6/25/2019
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Phil Johnson Ballfields Renovation <br /> Change Order No. 001 <br /> Change Order Effective Date: 7/18/19 <br /> CONTRACTOR <br /> By 1`x`-4- Date: ////11 2cl1 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Items Change Orders <br /> 1 $ (13,991.00) Haul and stockpile sod on city property adjacent to site. <br /> 2 $ (97,841.28) Credit the cost and installation of(4) Big Brown Mounds <br /> 3 $ 79,347.45 Supply and install all materials per plans and specs for the <br /> construction of a bio swale at field#2. Excavate and dispose of <br /> existing 12"storm drain in gravel parking lot and replace 18" base bid <br /> storm with 12"storm drain,add type 1 catch basin. <br /> 4 $ 5,917.79 Remove and dispose of 10 maple trees,grind roots 12" below grade, <br /> restore landscaping with top soil and hand seeding. <br /> 6 $ 118,281.27 Landscape Turf Modifications: Remove and dispose of spoils to COE <br /> dump site.Grade and establish subgrade. Lower existing electrical <br /> conduits and hand holes to new grade.Credit for an alternate <br /> landscape turf.Approximately 13,185 Sf. <br /> 91,714.23 Total Amount <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.