Laserfiche WebLink
Project: Phil Johnson Ballfields Renovation <br /> Change Order No. 001 <br /> Change Order Effective Date: 7/18/19 <br /> CONTRACTOR <br /> By 1`x`-4- Date: ////11 2cl1 <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Items Change Orders <br /> 1 $ (13,991.00) Haul and stockpile sod on city property adjacent to site. <br /> 2 $ (97,841.28) Credit the cost and installation of(4) Big Brown Mounds <br /> 3 $ 79,347.45 Supply and install all materials per plans and specs for the <br /> construction of a bio swale at field#2. Excavate and dispose of <br /> existing 12"storm drain in gravel parking lot and replace 18" base bid <br /> storm with 12"storm drain,add type 1 catch basin. <br /> 4 $ 5,917.79 Remove and dispose of 10 maple trees,grind roots 12" below grade, <br /> restore landscaping with top soil and hand seeding. <br /> 6 $ 118,281.27 Landscape Turf Modifications: Remove and dispose of spoils to COE <br /> dump site.Grade and establish subgrade. Lower existing electrical <br /> conduits and hand holes to new grade.Credit for an alternate <br /> landscape turf.Approximately 13,185 Sf. <br /> 91,714.23 Total Amount <br /> Page 3 of 3 <br />