Laserfiche WebLink
Change Order No.: Four <br /> Change Order Effective Date: Date of Mayor's Signature <br /> • <br /> CITY <br /> Attest: Approved As to Form: <br /> Office of the City Attorney <br /> APPROVED AS TO FORM <br /> (1 ) )A <br /> �� G David C.Hall,City Attorney <br /> Mayor City Clerk, . Ui) City Attorney <br /> Date: 2 Date: / '1 Date: //• /7 <br /> Recommended By:_ <br /> Construction Project Manager (if Engineering Department Director <br /> Manager (if applicable) Manager (if <br /> applicable) applicable) <br /> dzidigsuz <br /> /v/IA guistiriCep <br /> Date: Datp: <br /> Date: Date: <br /> ilizo//5j <br /> CONTRACTOR <br /> By ; Date: it.to• ?,DA� <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> Change Order No. Three contains a list of additional work that is required to: <br /> (a) Correct unforeseen conditions in the existing site and building. <br /> (b) Correct oversights in the original plans and specifications. <br /> (c) Comply with codes or rulings of building officials, and building inspectors. <br /> (d) Improve the quality of appearance and performance of the site and building. <br /> (e) Events/ Circumstances: See Attached Exhibit A Matrix. <br />