Laserfiche WebLink
� <br /> infiltra#aora_.#a�il�#ies.-Jo�ated alon�the base of the northern fill slopes near the PUD access road be <br /> _____..__�..n._-----...___._�__...___T. <br /> ---- __ <br /> .- ____..�__.�___.---__- -. -- <br /> designed using an infiltration rate of no more than.Q_5��nc.hes per hour. <br /> Recomme�tded Additional Ceotechnical Services <br /> Throughout this report, recommendations are provided where we consider additional geotechnical <br /> services to be appropriate. These additional services are summarized below: <br /> . t <br /> � ■ GeoEngineers should be retained to review the proposed storm water infiltration system with respect <br /> to potential impacts to slopes and existing deeper fiil soils, and structures supported on existing fill. <br /> �■ GeoEngineers should review the retaining wall designs for the project and be retained to design MSE <br /> walis or other, if necessary. <br /> A <br /> �■ GeoEngineers should be retained to review the project plans and specifications when complete to <br /> ' confirm that our design recommendations have been implemented as intended. <br /> ' ■ During construction, GeoEngineers should observe and evaluate the suitability of the foundation <br /> ' . subgrades, observe removal of unsuitable soils, evaluate the suitability of floor slab and road <br /> subgrades, observe construction of the retaining walls, observe installation of subsurface drainage <br /> measures, observe and test structural backfill, and provide a summary letter of our construction <br /> observation services. The purposes of GeoEngineers construction phase services are to confirm that <br /> the subsurface conditions are consistent with those observed in the explorations and other reasons <br /> described in Appendix C, Report Limitations and Guidelines for Use. <br /> LIMITATIONS <br /> We have prepared this report for Snohomish County PUD No. 1. The Snohomish County PUD No. 1 may <br /> distribute copies of this report to authorized agents and regulatory agencies as may be required for the <br /> project. <br /> Within the limitations of scope, schedule and budget, our services have been executed in accordance <br /> with generally accepted practices in the field of geotechnical engineering in this area at the time this <br /> report was prepared. The conclusions, recommendations, and opinions presented in this report are <br /> based on our professional knowledge, judgment and experience. No warranty or other conditions, <br /> express or implied, should be understood. <br /> Any electronic form, facsimile or hard copy of the original document (email, text, table and/or figure), if <br /> provided, and any attachments should be considered a copy of the original document. The original <br /> document is stored by GeoEngineers, Inc. and will serve as the official document of record. <br /> Please refer to Appendix D, titled "Report Limitations and Guidelines for Use" for additional information <br /> pertaining to use of this report. <br /> REFERENCES <br /> City of Everett, 2012. "Critical Areas Map 1." Roberta Goodwill GIS Analyst/Programmer Planning <br /> Department, August 2012. <br /> GEOENGINEER� October24,2014 Page21 <br /> File No.0482-027-02 <br />