Laserfiche WebLink
Start End Total 16.25 Logged By BHC Driller Geologic Drill, Inc. Drilling Hollow-Stem Auger <br /> Drilled 3/3/2014 3!3/2014 Depth(ft) Checked By RCM Method <br /> Surface Elevation(ft) 423 Hammer Rope&Cathead orilling XL Trailer Mounted <br /> Vertical Datum NAVD88 Data 140(Ibs)/30(in)Drop Equipment <br /> Easting(X) System Groundwater Depth to <br /> Northing(1� Datum <br /> Date Me2sured Water ft Elevation(ft) <br /> Notes: Elevation estimated from base survey map and is approximate Not encountered <br /> FIELD DATA <br /> � <br /> � -- � � � � o MATERIAL <br /> � � N `° > ° - REMARKS <br /> o �' � o � � �, � � � DESCRIPTION y� � <br /> � � j > iA U C L Q'y y C � <br /> O y � o- � m p� <br /> � a��i °� a�i o o m a��i co co o m �o a �.� <br /> W � � � 07 U (n F- � UL' C7 U � �U o�- <br /> � SP-SM Light brown fine to medium sand with silt and <br /> gravel(loose,moist)(fill) <br /> a,y0 8 9 SA 9 SA(%F=10) <br /> I <br /> 5 6 1 S SA I SM 13 SA %F=22 <br /> Gray brown silty fine to medium sand with gravel, ( ) <br /> oxidation staining and fine roots(medium <br /> dense,moist)(weathered till) <br /> ,�5 8 29 3 13 <br /> � <br /> 10 10 50/4" 4 SM Gray silty fne sand with gravel(very dense, � Rough driling <br /> moist)(glacial till) <br /> o - <br /> a <br /> a <br /> a <br /> z <br /> a I <br /> � <br /> x� � <br /> w ,�O 16 50/5" 5 7 <br /> o k <br /> � <br /> �I <br /> 0 <br /> � <br /> � <br /> `� 15 <br /> w — — <br /> z 14 50l3" 6 7 <br /> � � — <br /> o —- _ <br /> E <br /> E <br /> � <br /> m <br /> 0 <br /> a' <br /> � <br /> a <br /> 0 <br /> Y <br /> N <br /> W <br /> � <br /> U <br /> Z <br /> Q <br /> Y <br /> w Notes: See Figure A-1 for expianation of symbols. <br /> � <br /> � <br /> U <br /> • _ Log of Boring B-6 <br /> o Project: Beverly Park Substation <br /> E G EO E fV G I N E E RS � Project Location: Everett, washington <br /> � Figure A-7 <br /> � Projec t Num ber: 0 4 8 2-0 2 7-0 2 Sheet 1 of 1 <br />