Laserfiche WebLink
� <br /> Start End Total Logged By BHC Drillin <br /> Drilled 3/3/2014 3/3/2014 Depth(ft) 8 Checked By RCM Driller GeologiC D�ill, If1C. Method HollOw-Stem AUgef <br /> Surface Elevation(ft) 416 Hammer Rope&Cathead Driliing XL Trailer Mounted <br /> Vertical Datum NAVD88 Data 140(Ibs)/30(in)Drop Equipment <br /> Easting(X) System Groundwater <br /> Northing(1� Datum Depth to <br /> Date Measured Water ft Elev2tion(ftl <br /> Notes: Elevation estimated from base survey map and is approximate Not encountered <br /> FIELD DATA <br /> d <br /> � v E � � a MATERIAL <br /> °' � �' `° > � REMARKS <br /> � �' °' ° � Z °' �' `° DESCRIPTION = '� <br /> O �. � V - <br /> � L y � tn U � � J L Q'tn j C N <br /> � �- � U � � �tn >� @ O N � �� <br /> W ❑ C � �] �.J �F- �l � �U �U ❑�' <br /> � <br /> s �o Sn�t Brown to orange brown silty fne to medium sand �Z <br /> ^5 with gravel(medium dense,moist)(fill) <br /> a <br /> 18 501�' � 10 Rough drilling <br /> SM Gray silty fne to medium sand wth occasional <br /> i gravel(very dense,moist)(glacial tiil) <br /> 5 8 50/6" 3 ����I 8 <br /> ,�O <br /> h <br /> With increasing gravel content <br /> L50l6" 4 7 <br /> 0 <br /> � <br /> ¢ <br /> 0 <br /> z <br /> a <br /> � <br /> � <br /> x� <br /> 0 <br /> 0 <br /> c; <br /> � <br /> 0 <br /> m <br /> � <br /> w <br /> w <br /> z <br /> � <br /> z <br /> 0 <br /> w <br /> c� <br /> F <br /> E <br /> F- <br /> m <br /> � <br /> 'a <br /> � <br /> 'a <br /> 0 <br /> � <br /> Y <br /> N <br /> O <br /> CJ <br /> Z <br /> Q <br /> Y <br /> w Notes: See Figure A-1 for explanation of symbols. <br /> � <br /> � <br /> U <br /> c Log of Boring B-9 <br /> o Project: Beverly Park Substation <br /> E V EO E N G I N E E RS � Project Location: Everett, Washington Figure A-10 <br /> � � Project Number: 0482-027-02 Sheet 1 of 1 <br />