Laserfiche WebLink
� <br /> Date Excavated: 4/2/2009 Logged By: BPD <br /> Equipment: John Deere 120 Track Hoe Total Depth (ft) 10.0 <br /> SAMPLE <br /> � <br /> � � <br /> � -� � � m o -� MATERIAL REMARKS <br /> �, � � o � <br /> o � � � m � � � DESCRIPTION �,� <br /> � L C — C L Q'y � �N <br /> � �- in E N (6 O � � �C <br /> W � H (n F�— (7 (.`J U W �U <br /> —.._--- — —.._ . . <br /> TS 6 inches topsoil Probed(P)=6 to io inches <br /> SM Orange/brown siity fine sand with occasional gravel and trace organic <br /> ko`' � matter(loose,moist)(fill) <br /> P=2 to 3 inches <br /> O�` <br /> a 2 <br /> � � � 24 P=6 to 12 inches <br /> �. <br /> a�� 3 <br /> I <br /> i <br /> ��ti I <br /> 4 -- <br /> SP.9 Gray�brown silty fir,e sand�^nth gravel(very dense,moist)(glacial till) F<1-inch <br /> o'` <br /> °` s <br /> �{ � 8 <br /> � � i��. <br /> o� <br /> �` 6 <br /> 0 <br /> U �� 7 <br /> W <br /> � I.I <br /> - �� <br /> � 8 _ <br /> W <br /> ~I <br /> W <br /> � <br /> � 3�� 9 <br /> � <br /> � <br /> z �� 3 <br /> p 3�� 10 � _ _._ __. _ <br /> � Slow groundwater seepage observed at 4 feet <br /> _ No caving observed <br /> E <br /> � <br /> E <br /> � <br /> 0 <br /> � <br /> z <br /> c� <br /> F <br /> u� <br /> U <br /> W <br /> O <br /> C <br /> a <br /> 0 <br /> z <br /> � Notes: See Figure A-1 for explanation of symbols. <br /> � The depths on the test pit logs are based on an average of ineasurements across the test pit and should be considered accurate to 0.5 foot. <br /> � <br /> 3 <br /> a Log of Test Pit TP-8 <br /> o Project: Beverly Park Substation <br /> a C EO E N G I N E E RS � Project Location: Everett, Washington Figure A-18 <br /> � P r o j e c t N u m b e r: 0 4 8 2-0 2 7-0 2 S hee t 1 o f 1 <br />