My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1707 SCENIC DR SNO CO PUD Geotech Report 2022-10-25
>
Address Records
>
SCENIC DR
>
1707
>
SNO CO PUD
>
Geotech Report
>
1707 SCENIC DR SNO CO PUD Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:07:07 PM
Creation date
1/6/2020 2:11:56 PM
Metadata
Fields
Template:
Address Document
Street Name
SCENIC DR
Street Number
1707
Tenant Name
SNO CO PUD
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX D <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE1 <br /> This appendix provides information to help you manage your risks with respect to the use of this report. <br /> Read The�e Provisions Closely <br /> It is important to recognize that the geoscience practices (geotechnical engineering, geology and <br /> environmental science) rely on professional judgment and opinion to a greater extent than other <br /> engineering and natural science disciplines, where more precise and/or readily observable data may <br /> exist. To help clients better understand how this difference pertains to our services, GeoEngineers <br /> includes the following explanatory "limitations" provisions in its reports. Please confer with GeoEngineers <br /> if you need to know more how these "Report Limitations and Guidelines for Use" apply to your project or <br /> site. <br /> Geotechnical Services Are Performed for Specific Purpo�es, Persons and Projects <br /> This report has been prepared for Snohomish County Public Utility District (PUD) and for the Beverly Park <br /> Substation Expansion project specifically identified in the report. The information contained herein is not <br /> applicable to other sites or projects. <br /> GeoEngineers structures its services to meet the specific needs of its clients. No party other than the <br /> party to whom this report is addressed may rely on the product of our services unless we agree to such <br /> reliance in advance and in writing. Within the limitations of the agreed scope of services for the Project, <br /> and its schedule and budget, our services have been executed in accordance with our Agreement with <br /> Snohomish County PUD No. 1 dated September 24, 2014 and generally accepted geotechnical practices <br /> in this area at the time this report was prepared. We do not authorize, and will not be responsible for,the <br /> use of this report for any purposes or projects other than those identified in the report. <br /> � <br /> A Geotechnical Engineering or Geolagic Report is Based on a Unique Set of Project-Specific <br /> Factors <br /> This report has been prepared for the Beverly Park Substation Expansion project. GeoEngineers <br /> considered a number of unique, project-specific factors when establishing the scope of services for this <br /> project and report. Unless GeoEngineers specifically indicates otherwise, it is important not to rely on this <br /> report if it was: <br /> e not prepared foryou, <br /> ■ not prepared for your project, <br /> ■ not prepared for the specific site explored, or <br /> ■ completed before important project changes were made. <br /> 1 Developed based on material provided by ASFE, Professional Firins Practicing in the Geosciences;www.asfe.org. <br /> GEOENGINEER� October24,2014 Page D-1 <br /> File No.0482-027-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.