Laserfiche WebLink
APPENDIX D <br /> REPORT LIMITATIONS AND GUIDELINES FOR USE1 <br /> This appendix provides information to help you manage your risks with respect to the use of this report. <br /> Read The�e Provisions Closely <br /> It is important to recognize that the geoscience practices (geotechnical engineering, geology and <br /> environmental science) rely on professional judgment and opinion to a greater extent than other <br /> engineering and natural science disciplines, where more precise and/or readily observable data may <br /> exist. To help clients better understand how this difference pertains to our services, GeoEngineers <br /> includes the following explanatory "limitations" provisions in its reports. Please confer with GeoEngineers <br /> if you need to know more how these "Report Limitations and Guidelines for Use" apply to your project or <br /> site. <br /> Geotechnical Services Are Performed for Specific Purpo�es, Persons and Projects <br /> This report has been prepared for Snohomish County Public Utility District (PUD) and for the Beverly Park <br /> Substation Expansion project specifically identified in the report. The information contained herein is not <br /> applicable to other sites or projects. <br /> GeoEngineers structures its services to meet the specific needs of its clients. No party other than the <br /> party to whom this report is addressed may rely on the product of our services unless we agree to such <br /> reliance in advance and in writing. Within the limitations of the agreed scope of services for the Project, <br /> and its schedule and budget, our services have been executed in accordance with our Agreement with <br /> Snohomish County PUD No. 1 dated September 24, 2014 and generally accepted geotechnical practices <br /> in this area at the time this report was prepared. We do not authorize, and will not be responsible for,the <br /> use of this report for any purposes or projects other than those identified in the report. <br /> � <br /> A Geotechnical Engineering or Geolagic Report is Based on a Unique Set of Project-Specific <br /> Factors <br /> This report has been prepared for the Beverly Park Substation Expansion project. GeoEngineers <br /> considered a number of unique, project-specific factors when establishing the scope of services for this <br /> project and report. Unless GeoEngineers specifically indicates otherwise, it is important not to rely on this <br /> report if it was: <br /> e not prepared foryou, <br /> ■ not prepared for your project, <br /> ■ not prepared for the specific site explored, or <br /> ■ completed before important project changes were made. <br /> 1 Developed based on material provided by ASFE, Professional Firins Practicing in the Geosciences;www.asfe.org. <br /> GEOENGINEER� October24,2014 Page D-1 <br /> File No.0482-027-02 <br />