My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/12/31 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/12/31 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 9:32:00 AM
Creation date
1/7/2020 9:30:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/31/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'`ate Quote Number: 529522-1 <br /> Altec,Inc. <br /> Item Description Qty Price <br /> 54. Power Distribution Module 6 Is A Compact Self-Contained Electronic System That 1 • <br /> Provides A Standardized Interface With The Chassis Electrical System. (Includes <br /> Operator's Manual) <br /> 55. Install Chassis (OEM)Supplied Backup Camera in Final Assembly <br /> 56. Install secondary stowage system. 1 <br /> 57. Boom Out Of Stow Indicator For Lower Boom 1 <br /> 58. PTO Indicator Light Installed In Cab 1 <br /> Finishing Details <br /> 59. Powder Coat Unit Altec White 1 <br /> 60. Finish Paint Body Accessories Above Body Floor Altec White 1 <br /> 61. Altec Standard;Components mounted below frame rail shall be coated black by Altec. 1 <br /> i.e. step bumpers,steps, frame extension, pintle hook mount,dock bumper mounts, <br /> D-rings, receiver tubes, accessory mounts,light brackets, under-ride protection, <br /> etc.Components mounted to under side of body shall be coated black by Altec.i.e. <br /> Wheel chock holders, mud flap brackets, pad carriers,boxes,lighting brackets, steps, <br /> and ladders. <br /> 62. Apply Non-Skid Coating to all walking surfaces 1 <br /> 63. English Safety And Instructional Decals 1 <br /> 64. Vehicle Height Placard-Installed In Cab 1 <br /> 65. Altec Greenfleet Decals, Hybrid Decal Kit 1 <br /> 66. Placard, HVI-22 Hydraulic Oil <br /> 1 <br /> 67. Dielectric test unit according to ANSI requirements. 1 <br /> 68. Stability test unit according to ANSI requirements. 1 <br /> 69. Focus Factory Build 1 <br /> 70. Delivery Of Completed Unit 1 <br /> 71. Inbound Freight 1 <br /> 72. AT40G FA Installation 1 <br /> 73. JEMS 4E4 Hybrid System Installation 1 <br /> Hybrid <br /> 74. JEMS 4E4(Jobsite Energy Management System) includes ePTO as Primary Hydraulic 1 <br /> Power <br /> We Wish To Thank You For Giving Us The Pleasure <br /> And Opportunity of Serving You <br /> n[�, Page 5 of 8 <br /> UTILITY EQUIPMENT AND MES SINCE 1929 <br />
The URL can be used to link to this page
Your browser does not support the video tag.