My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> If Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> U in writing of any change in the closure hours. <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Notify the local Fire, Police and Engineering Departments before the beginning of <br /> each phase of construction so that these agencies may re-route their emergency <br /> vehicles around the construction zone. The non-emergency phone number for <br /> Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public Works <br /> Engineering is 257-8800. <br /> ' Notify City of Everett Transit at 425-257-8984 and Community Transit at 425-348- <br /> 7100 of all street closures or delays at least 24 hours in advance to enable rerouting <br /> of buses. <br /> U Notify the property owners at least 72 hours in advance to enable them to remove <br /> vehicles parked in the vicinity of Work. Towing vehicles shall be the responsibility of the <br /> Contractor and no additional payment will be made. <br /> Further supplement 1-07.23(1) by adding the following: <br /> 1-07.23(1)A General Requirements Traffic <br /> (******) <br /> The following general requirements apply to all Work on the Project: <br /> Prepare and submit to Engineer a Traffic Control Plan in accordance with 1- <br /> 10.2(2) TRAFFIC CONTROL PLANS. <br /> ' Refer to 1-08.4(2) SPECIAL CONSTRUCTION CONSTRAINTS regarding <br /> construction constraints resulting from traffic control. <br /> Notify all affected property owners prior to commencing the barricading of <br /> ' streets, sidewalks and driveways. <br /> All business driveways shall remain open except as necessary to permit curing <br /> of construction materials or for short periods of time as required for <br /> excavations. However, at least one driveway per business shall remain open <br /> to vehicular traffic at all times unless otherwise approved by the Engineer and <br /> affected property owner in writing. <br /> ' Signs and barricades shall be supplemented by lanterns or flasher units during <br /> the hours of darkness. <br /> ' Drivers of motor vehicles used in connection with the construction shall obey <br /> traffic rules posted for such location in the same manner and under the same <br /> restrictions as provided for the drivers of private vehicles. <br /> ' Conduct the Work, at all time throughout the project, in such a manner as will <br /> obstruct and inconvenience vehicular and pedestrian traffic as little as possible. <br /> Keep the streets, sidewalks and private driveways open except for the brief <br /> periods when actual Work is being done. <br /> ' 1-07.24 Rights of Way <br /> Deletel-07.24 and substitute the following: <br /> Street right of way lines, limits of easements, and limits of construction permits are <br /> indicated on the Plans. The Contractor's construction activities shall be confined within <br /> these limits, unless arrangements for use of private property are made. <br /> Watermain Replacement "U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.