My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> notifies the City in writing prior to the City making such final payment. Payment by <br /> the City shall not release the Contractor or its Surety from any obligation under the <br /> Contract or under the payment and performance bond. <br /> Upon completion of all Work and after final inspection, the amount due the 111 <br /> Contractor under the Contract will be paid based upon the final estimate made by <br /> the Engineer and presentation of a Final Contract Voucher Certification signed by <br /> the Contractor. Such voucher shall be deemed a release of all claims of the <br /> Contractor unless a claim is filed in accordance with the requirements of 1-09.11 <br /> DISPUTES AND CLAIMS and is expressly excepted from the Contractors <br /> Certification on the Final Contract Voucher Certification. <br /> 1-09.9(5) Back Charges to Contractor <br /> The Contractor shall pay the City on demand everything charged to it under the terms <br /> of this Contract. Such charges may be deducted by the City from money due or to <br /> become due to the Contractor under the Contract. The City may recover such charges <br /> from the Contractor or from its Surety. <br /> Contractor agrees to pay the costs of overtime or excessive inspection and observation <br /> costs incurred by the City. Overtime inspection shall include inspection required during <br /> Saturdays, Sundays, City holidays and weekdays in excess of 40 hours per week or ' <br /> outside of normal working hours and inspections or observations that result in an <br /> inspector or observer working more than 40 hours in a week. Costs of such overtime or <br /> excessive inspection or observation include architecture, engineering, construction <br /> management services, inspection, general supervision and overhead expenses that are <br /> directly chargeable to the overtime or excessive work. Contractor agrees that City will <br /> deduct such charges from payments due the Contractor. In the event the City issues a <br /> Change Order requiring the Contractor to work in excess of the established schedule of <br /> working hours, the City will not charge the Contractor for associated inspection costs. <br /> The Contractor shall be compensate the City for the actual costs of engineering, <br /> inspection, general supervision, right-of-way costs, permit fees, overhead expenses, <br /> and any other ascertainable direct costs to the City that are directly chargeable to the <br /> Work and that accrue during the period of such extension. The actual costs do not <br /> include charges for final inspection and preparation of the final payment by the City. <br /> 1-09.9(6) Retainage <br /> Pursuant to RCW Chap. 60.28, a sum of five percent of the monies earned by the <br /> Contractor will be retained from progress estimates. In addition to protecting the <br /> interests of those identified in RCW Chap. 60.28, such retainage will be used as a trust <br /> fund for the protection of the City. <br /> At the option of the Contractor, monies retained under the provisions of RCW 60.28 will <br /> be: <br /> 1. Retained in a fund by the City, or <br /> 2. Deposited by the City in an interest-bearing escrow account in a bank, mutual I <br /> saving bank, or savings and loan association. Interest on monies so retained <br /> shall be paid to the Contractor in accordance with requirements of this <br /> section. Deposits are to be in the name of the City and may not be withdrawn <br /> without the City's written authorization. The City will issue a check <br /> representing the sum of the monies reserved, payable to the bank or trust <br /> company. Such check shall be converted into bonds and securities chosen by <br /> the Contractor as the interest accrues. <br /> The Contractor shall designate the option desired at the time the Contract is executed. <br /> If the Contractor in chooses option 2, deposit in escrow account, Contractor agrees to <br /> Watermain Replacement"U" Division 1 —GENERAL REQUIREMENTS October 1, 2019 <br /> WO No—UP3698 SP—114 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.