CITY OF EVERETT SPECIAL PROVISIONS ' <br /> i <br /> 2-02.3(9) Abandon Existing Water Valves In-place <br /> (******) <br /> Prior to abandoning existing water valves in-place, coordinate with City to have City <br /> forces close valve. After City forces verify valve is closed, remove valve box and <br /> extension, if any, add blind flange or plug if noted on Plans, and backfill with Gravel <br /> Borrow as specified in 9-03.14(1). Compact backfill to a minimum of 95 percent <br /> maximum density in accordance with 2-03.3(14)D. <br /> 2-02.4 Vacant ' <br /> Revise 2-02.4 as follows: <br /> 2.02.4 Measurement <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section <br /> 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> For curb and gutter cement removal with concrete pavement, the curb and gutter will be <br /> considered as pavement removal and the measurement for payment will be to the back <br /> of the curb. <br /> 2-02.5 Payment <br /> Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> If there is no bid item to cover pavement removals, then they shall be included with the <br /> construction of the respective Work including, but not limited to, combined sewer pipe, <br /> water main, water service line, manhole, side sewer pipe, storm drain pipe, catch basins, <br /> and underground utility vaults. <br /> Include curb and gutter and sidewalk removal with construction of the respective Work <br /> including, but not limited to, combined sewer pipe, water main, water service line, <br /> manhole, side sewer pipe, storm drain pipe, catch basins, and underground utility vaults <br /> with no direct compensation made. <br /> If there is no pay item for pipe abandonment, then it shall be included with the <br /> construction of the respective Work including, but not limited to, sewer or storm drain <br /> pipe, water main, manhole, catch basin or side sewer with no direct compensation made. <br /> If there is no pay item for existing valve abandonment, then it shall be included with the <br /> construction of other items of Work with no direct compensation made. ' <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after completion <br /> of utility work. Grading for street reconstruction shall conform to COE Standard Drawing <br /> No. 302, unless otherwise noted on the Plans. Grading for pavement patching shall <br /> conform to COE Standard Drawing No. 326, unless otherwise noted on the Plans. <br /> 2-03.2 Vacant , <br /> Revise 2-03.2 as follows: <br /> WaterMainImprovement Im rovement"U" Division 2—EARTHWORK October 1, 2019 <br /> WO No.—UP3698 SP—134 <br />