Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS , <br /> 2-03.4 Measurement <br /> Delete all paragraphs under 2-03.4 and substitute the following: 1 <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Items Descriptions and provided in Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-03.5 Payment <br /> Delete all paragraphs under 2-03.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for"Proof Rolling" as required in this section <br /> for excavated portions of the roadway and the Contractor shall include costs in his <br /> various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> Imported material required in this section shall be paid for by the unit Bid price for that <br /> material. Payment for placement and compaction of import material shall be included in <br /> the unit price per ton of import material. <br /> 2-04 HAUL I <br /> 2-04.1 Description <br /> Delete the first paragraph of 2-04.1 and substitute the following: <br /> This Work shall consist of transporting excavated material from its original site to its final <br /> place on the Project or to a Contractor arranged waste site. <br /> 2-04.3 Vacant , <br /> Revise 2-04.3 to read as follows: <br /> 2-04.3 Construction Requirements <br /> Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br /> driveways, trails, sidewalks or parking lots not being improved in the Contract. <br /> 2-04A Measurement <br /> Revise 2-04.4 to read as follows: <br /> Haul work will not be measured. <br /> 2-04.5 Payment ' <br /> Revise 2-04.5 to read as follows: <br /> All costs for the Work described in Section 2-04 shall be included with excavation work <br /> with no direct compensation made. <br /> 2-07 WATERING <br /> 2-07.3 Construction Requirements , <br /> Supplement 2-07.3 by adding the following: <br /> Water Main Improvement"U" Division 2—EARTHWORK October 1, 2019 <br /> WO No.—UP3698 SP—136 <br /> i <br />