Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-04.2(2)B UsingWarm Mix Asphalt Process <br /> p <br /> The Contractor may elect to use additives that reduce the optimum mixing <br /> temperature or serve as a compaction aid for producing HMA. Additives include <br /> organic additives, chemical additives and foaming processes. The use of Additives <br /> ' is subject to the following: <br /> a. Do not use additives that reduce the mixing temperature more than allowed <br /> in Section 5-04.3(6) in the production of mixtures. <br /> b. Before using additives, obtain the Engineer's approval using WSDOT Form <br /> 350-076 to describe the proposed additive and process. <br /> 5-04.3 Construction Requirements <br /> 5-04.3(1) Weather Limitations <br /> Do not place HMA for wearing course on any Traveled Way beginning October 1st <br /> through March 31st of the following year without written concurrence from the Engineer. <br /> Do not place HMA on any wet surface, or when the average surface temperatures are <br /> less than those specified in Table 1, or when weather conditions otherwise prevent the <br /> proper handling or finishing of the HMA. <br /> Table 1 - Minimum Surface Temperature for Paving <br /> Compacted Thickness <br /> (Feet) Wearing Course Other Courses <br /> Less than 0.10 55°F 45°F <br /> 1 0.10 to .20 45°F 35°F <br /> More than 0.20 35°F 35°F <br /> 5-04.3(2) Paving Under Traffic <br /> Apply the requirements of this Section when the Roadway being paved is open to traffic. <br /> Keep intersections open to traffic at all times, except; when paving the intersection or <br /> paving across the intersection. During such time, and provided that there has been an <br /> advance warning to the public, the intersection may be closed for the minimum time <br /> required to place and compact the mixture. In hot weather, the Engineer may require <br /> the application of water to the pavement to accelerate the finish rolling of the pavement <br /> and to shorten the time required before reopening to traffic. <br /> Before closing an intersection, place advance warning signs and signs marking the <br /> detour or alternate route. <br /> During paving operations, maintain temporary pavement markings throughout the <br /> project. Install temporary pavement markings on the Roadway prior to opening to traffic. <br /> Provide temporary pavement markings in accordance with Section 8-23. <br /> Include all costs in connection with performing the Work in accordance with these <br /> requirements, except the cost of temporary pavement markings, in the unit Contract <br /> prices for the various Bid items involved in the Contract. <br /> 5-04.3(3) Equipment <br /> 5-04.3(3)A Mixing Plant <br /> Provide plants used for the preparation of HMA conforming to the following <br /> requirements: <br /> Watermain Replacement"U" Division 5—SURFACE TREATMENTS October 1, 2019 <br /> AND PAVEMENTS <br /> WO No.—UP3698 SP-149 <br />