My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-04.3(3)C Pavers <br /> Provide HMA pavers that are self-contained, power-propelled units, with <br /> an internally heated vibratory screed and shall be capable of spreading and finishing <br /> courses of HMA plant mix material in lane widths required by the paving section <br /> shown in the Plans. <br /> ' Provide HMA paver in good condition and have the most current equipment <br /> available from the manufacturer for the prevention of segregation of the HMA <br /> mixture installed in good condition and in working order. Provide equipment <br /> certification listing the make, model, and year of the paver and note retrofitting of <br /> any equipment. <br /> Operate the screed in accordance with the manufacturer's recommendations and <br /> so it effectively produces a finished surface of the required evenness and texture <br /> without tearing, shoving, segregating, or gouging the mixture. Provide a copy of the <br /> manufacturer's recommendations upon City's request. Extensions producing the <br /> ' same results, including ride, density, and surface texture as obtained by the primary <br /> screed will be allowed. Do NOT use extensions without augers and an internally <br /> heated vibratory screed in the Traveled Way. <br /> ' When specified in the Contract, reference lines for vertical control will be required. <br /> Place lines on both outer edges of the Traveled Way of each Roadway. Horizontal <br /> control utilizing the reference line will be permitted. Control the grade and slope for <br /> intermediate lanes automatically from reference lines or by means of a mat <br /> referencing device and a slope control device. When the finish of the grade <br /> prepared for paving is superior to the established tolerances and when, in the <br /> opinion of the Engineer, further improvement to the line, grade, cross-section, and <br /> smoothness can best be achieved without the use of the reference line, a mat <br /> referencing device may be substituted for the reference line. Substitution of the <br /> ' device will be subject to the continued approval of the Engineer. A joint matcher <br /> may be used subject to the approval of the Engineer. The reference line may be <br /> removed after the completion of the first course of HMA when approved by the <br /> Engineer. Whenever the Engineer determines that any of these methods are failing <br /> to provide the necessary vertical control, the reference lines will be reinstalled by <br /> the Contractor. <br /> Furnish and install all pins, brackets, tensioning devices, wire, and accessories <br /> necessary for satisfactory operation of the automatic control equipment. <br /> If the paving machine in use is not providing the required finish, the Engineer may <br /> suspend Work as allowed by Section 1-08.6. Thoroughly remove any cleaning or <br /> solvent type liquids spilled on the pavement before paving proceeds. <br /> 5-04.3(3)D Material Transfer Device or Material Transfer Vehicle <br /> Provide a Material Transfer Device/Vehicle (MTD/V) with the Engineer's approval, <br /> unless otherwise required by the Contract. <br /> Where an MTDN is required by the contract, the Engineer may approve paving <br /> without an MTD/V, at the Contractor's request. The Engineer will determine if an <br /> equitable adjustment in cost or time is due. <br /> Mix the MTDN when used with the HMA after delivery by the hauling equipment <br /> and prior to laydown by the paving machine. Sufficiently mix the HMA to obtain a <br /> uniform temperature throughout the mixture. The length of the windrow for windrow <br /> elevator may be limited in urban areas or through intersections at the discretion of <br /> the Engineer. <br /> To be approved for use, provide an MTV meeting the following: <br /> Watermain Replacement"U" Division 5—SURFACE TREATMENTS October 1, 2019 <br /> AND PAVEMENTS <br /> WO No.—UP3698 SP-151 <br />
The URL can be used to link to this page
Your browser does not support the video tag.