My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> a minimum of three representative samples. Acceptance of rejected <br /> material will be based on conformance with the nonstatistical acceptance <br /> Specification. If the CPF for the rejected material is less than 0.75, no <br /> payment will be made for the rejected material and Contractor will bear the <br /> cost of sampling and testing. If the CPF is greater than or equal to 0.75, <br /> the City will bear the cost of sampling and testing. If the material is rejected <br /> before placement and the CPF is greater than or equal to 0.75, <br /> compensation for the rejected material will be at a CPF of 0.75. If rejection <br /> occurs after placement and the CPF is greater than or equal to 0.75, <br /> compensation for the rejected material will be at the calculated CPF with <br /> an addition of 25 percent of the unit Contract price added for the cost of <br /> removal and disposal. <br /> 5-04.3(11)D Rejection -A Partial Sublot <br /> In addition to the random acceptance sampling and testing, the Engineer <br /> may also isolate from a normal sublot any material that is suspected of <br /> being defective in relative density, gradation or asphalt binder content. <br /> Such isolated material will not include an original sample location. <br /> ' Engineer will obtain a minimum of three random samples of the suspect <br /> material to test. The material will then be statistically evaluated as an <br /> independent lot in accordance with Section 1-06.2(2). <br /> 5-04.3(11)E Rejection -An Entire Sublot <br /> Engineer may reject an entire sublot suspected of being defective. When <br /> a sublot is rejected, obtain a minimum of two additional random samples <br /> from this sublot. Evaluate these additional samples and the original sublot <br /> as an independent lot in accordance with Section 1-06.2(2). <br /> 5-04.3(11)F Rejection -A Lot in Progress <br /> Shut down operations and do NOT resume HMA placement until such time <br /> as the Engineer is satisfied that material conforming to the Specifications <br /> can be produced: <br /> a. When the Composite Pay Factor (CPF) of a lot in progress drops <br /> below 1.00 and the Contractor is taking no corrective action, or <br /> b. When the Pay Factor (PF) for any constituent of a lot in progress <br /> drops below 0.95 and the Contractor is taking no corrective action, <br /> or <br /> c. When either the PFi for any constituent or the CPF of a lot in <br /> progress is less than 0.75. <br /> 5-04.3(11)G Rejection -An Entire Lot (Mixture or Compaction) <br /> Engineer will reject an entire lot with a CPF of less than 0.75. <br /> 1 5-04.3(12) Joints <br /> 5-04.3(12)A HMA Joints <br /> 5-04.3(12)A1 Transverse Joints <br /> Conduct operations such that the placing of the top or wearing course <br /> is a continuous operation or as close to continuous as possible. <br /> Unscheduled transverse joints will be allowed and the roller may pass <br /> over the unprotected end of the freshly laid mixture only when the <br /> placement of the course must be discontinued for such a length of <br /> time that the mixture will cool below compaction temperature. When <br /> resuming the Work, cut back the previously compacted mixture to <br /> produce a slightly beveled edge for the full thickness of the course. <br /> Watermain Replacement"U" Division 5—SURFACE TREATMENTS October 1, 2019 <br /> AND PAVEMENTS <br /> WO No.—UP3698 SP-161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.