My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IIM EVERETT PUBLIC WORKS' <br /> I =IM WASHINGTON <br /> IADDENDUM NO. 1 <br /> TO <br /> 1 WATERMAIN IMPROVEMENT"U" <br /> W.O. # UP-3698 <br /> INOVEMBER 4, 2019 <br /> NOTICE TO PLANHOLDERS: <br /> I Addendum No. 1 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above-named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> I Bidders must acknowledge receipt of Addendum No. 1 in the space provided on page SP-23 in <br /> Division P, Proposal Form. Failure to comply with this requirement may render the Bid non- <br /> responsive and may cause its rejection. <br /> 1 This Addendum consists of 1 page, including all revisions, attachments and details. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> ISPECIFICATIONS, PROPOSAL AND CONTRACT DOCUMENTS <br /> Item 1 - PLANS, DRAWING W4, SHEET 6 <br /> IWithout issuing a new drawing, delete the leader for note 1 to service for 1731 Baker Avenue. <br /> Item 2 - PLANS, DRAWING W5, SHEET 7 <br /> I Without issuing a new drawing, provide new 1-inch combination air/vacuum valve near Station <br /> 22+60, with vent piping to the east just behind the sidewalk. Final location will be determined <br /> in field. <br /> All other requirements of the contract q a t documents remain in effect. <br /> 1 City of Everett -c).1' <br /> .%04 WAsgI <br /> Richard Hefti, P.E. Oyu: A 44529 �. ,,, <br /> Project Manager �• ; ;rs`:.t;`w <br /> 1 <br /> I <br /> IAddendum 1 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax(425) 257-8882 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.