My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Apply permanent seed mixture #3 uniformly over the areas being restored at a <br /> rate of 7-pounds per 1,000 square feet. <br /> ' Apply temporary seed mixture uniformly over the areas being restored at a rate <br /> of 2-pounds per 1,000 square feet. <br /> Apply fertilizer at a rate of 12 pounds per 1,000 square feet. For hydroseeding <br /> ' application, incorporate the fertilizer into the seed, mulch and water slurry and <br /> apply in accordance with these Special Provisions. <br /> 8-01.3(2)C Seeding and Fertilizing <br /> ' Supplement 8-01.3(2)C by adding the following: <br /> No liming application is required. <br /> 8-01.3(2)D Mulching <br /> Supplement 8-01.3(2)D by adding the following: <br /> Apply wood cellulose fiber at the rate of 60 pounds per 1,000 square feet. <br /> 8-01.3(8) Street Cleaning <br /> Delete 8-01.3(8) and substitute the following: <br /> Provide self-propelled pickup sweepers equipped with water spray systems for dust <br /> ' control and designed and operated to meet air quality standards for pavement <br /> cleaning and debris removal as required. The use of supplementary water to <br /> suppress dust while performing cleaning Work shall be held to a minimum unless <br /> ' designated otherwise by the Engineer. <br /> Plan construction operation to minimize the need for street cleaning. <br /> Sweep streets and roadways as needed at least once per day. Sweep all roadway <br /> areas subject to construction traffic within the Project area and connecting streets, <br /> preferably during non-peak use hours of the Project site. More frequent cleaning <br /> may be required, as directed by the City's Inspector, as conditions warrant. <br /> Clean up spills immediately. Failure to clean streets or spills as required will result <br /> in City procuring street cleaning services, or cleaning streets themselves at City <br /> overtime rates. Either way, Contractor shall be responsible for reimbursing the City <br /> for cost incurred. If Contractor fails to promptly reimburse City then City will deduct <br /> cost, plus interest on unpaid balance, from Contractor's final payment. <br /> 8-01.3(9) Sediment Control Barriers <br /> 8-01.3(9)A Silt Fence <br /> Delete the fifth paragraph in 8-01.3(9)A and substitute the following: <br /> Provide steel posts consisting of U, T, L or C shape posts with a minimum <br /> weight of 1.35 lbs/ft, or other steel posts having equivalent strength and <br /> bending resistance to the posts listed. Provide silt fence conforming to COE <br /> Standard Drawing 214. <br /> ' 8-01.3(15) Maintenance <br /> Delete the fifth paragraph of 8-01.3(15). <br /> ' 8-01.3(16) Removal <br /> Revise the first paragraph of 8-01.3(16) to read as follows: <br /> The Contractor shall remove all temporary BMP's and all associated hardware <br /> ' from the project limits prior to Physical Completion unless otherwise approved <br /> by the Engineer. <br /> 8-01.4 Measurement <br /> Delete all paragraphs in 8-01.4 and substitute the following: <br /> ' Watermain Replacement"U" Division 8-MISC CONSTRUCTION October 1, 2019 <br /> WO No.-UP3698 SP-191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.