My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' CITY OF EVERETT SPECIAL PROVISIONS <br /> ' 8-02.3(16)A Lawn Installation —Sod <br /> (******) <br /> ' Install sod in irrigated areas only after the irrigation system is fully operational. <br /> Unless the Engineer approves otherwise, install sod between March 1 and October <br /> 1. Place sod strips within 48-hours of being cut. Place strips without voids and <br /> stagger the end joints. Roll sod with a smooth roller following placement to ensure <br /> good contact with the soil. <br /> During the establishment period, erect barriers, with warning signs where <br /> necessary, to preclude pedestrian traffic over the newly placed sod. <br /> Prepare areas for sod in accordance with standard horticultural practices as follows: <br /> 1. Rototill, or otherwise cultivate, to a minimum depth of 4-inches into the <br /> ground surface. Thoroughly incorporate a 10-2-10 fertilizer in the rototilling <br /> process at a rate of 4 pounds of available Nitrogen per 1000 square feet. <br /> 2. Rake the surface to even grade without low spots to trap water and round <br /> ' surface to match surroundings. <br /> 3. Add topsoil as required by the design. <br /> NOTE: Topsoil will be paid for separately if required. <br /> 4. Lightly dampen and compact the finished grade. <br /> 5. Install sod taking care to butt each piece tightly against the adjacent one. <br /> Stagger butt joints. Lay sod on sloped areas with the long dimension <br /> parallel to the toe or top of slope. After placing, roll the sod and sprinkle <br /> ' heavily with water. <br /> 6. Provide tools specially designed for the work and satisfactory to the <br /> Engineer. <br /> ' 7. Water and fertilize the sod during the 90 days establishment period. <br /> Schedule watering to prevent joints from drying between sod strips. Apply <br /> 6-2-4 fertilizer at 6 week intervals at the rate of 1 to 1-1/2 pounds of <br /> available Nitrogen per 1,000 square feet per application. <br /> Where Shown that sod is to be replaced, the work shall consist of the removal and <br /> replacement of existing lawn turf by cutting the sod to be removed into convenient <br /> ' sized squares or strips to uniform thickness, piling and storing in a dampened <br /> condition, and finally replacing the sod in its original position. This work will be <br /> performed where the special provisions provide for such work. <br /> The Contractor may at his option use sod brought in from an outside source in lieu <br /> of replacing existing sod. If the Contractor elects to use sod from an outside source, <br /> the Engineer shall approve the supply source. <br /> ' The sod shall be removed to a uniform depth of approximately 2-inches with an <br /> approved type of sod cutter. This operation shall be performed in such a manner <br /> as to ensure uniform thickness of sod throughout the operation. <br /> Where sod is to be replaced with new sod, provide new sod in accordance with 9- <br /> 14.6(8) of these Special Provisions and the Standard Specifications. <br /> Guarantee sod to survive in a healthy condition through the 90 day establishment <br /> ' period. The establishment period shall begin on the date the Engineer accepts the <br /> sod placement. Remove and replace, at Contractor's expense, sod that in the <br /> opinion of the Engineer is not in a healthy growing condition at the end of the <br /> ' establishment period. Provide replacement sod that is of the same mixture and <br /> grade as the surviving sod. <br /> Supplement 8-02.3 by adding the following: <br /> Watermain Replacement "U" Division 8—MISC CONSTRUCTION October 1, 2019 <br /> WO No.—UP3698 SP—193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.