My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' Depress the cement concrete curb at locations shown on the Plans, or as directed <br /> by the Engineer, for concrete curb ramps and driveways, in accordance with COE <br /> Standard Drawings No., , 315, 316, 317, 318, 319, 320, 321 and 322. <br /> ' Construct cement concrete curbs where shown on the Plans, or as directed by the <br /> Engineer, in accordance with COE Standard Drawing Nos. 307 308and 309. <br /> ' Construct storm drainage frames and grates into cement concrete curb and gutter <br /> at locations shown on the Plans in accordance with COE Standard Drawings Nos. <br /> 407 and 412. <br /> ' After finishing, spray cement concrete curb, gutters and spillways using transparent <br /> curing compound in accordance with 5-05.3(13)A of the Standard Specifications. <br /> 8-04.3(1)A Extruded Cement Concrete Curb <br /> ' Supplement 8-04.3(1)A by adding the following: <br /> Construct extruded cement concrete curb where shown on the Plans and in <br /> accordance with COE Standard Drawing No. 309. <br /> ' 8-04.3(2) Extruded Asphalt Concrete Curbs, and Gutters <br /> Supplement 8-04.3(2) by adding the following: <br /> Construct extruded asphalt concrete curbs where shown on the Plans, or as <br /> ' directed by the Engineer, in accordance with COE Standard Drawing No. 310. <br /> 8-04.4 Measurement <br /> ' Delete all paragraphs in 8-04.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> 8-04.5 Payment <br /> Delete all paragraphs in 8-04.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT, of the Standard Specifications. <br /> 8-05 VACANT <br /> Delete Section 8-05 and substitute the following: <br /> ' 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES <br /> 8-06.1 Description <br /> t Supplement 8-06.1 by adding the following: <br /> This Work also includes concrete driveway slabs behind back of sidewalks and <br /> thickened sidewalk driveway approaches. <br /> ' 8-06.2 Materials <br /> Supplement 8-06.2 by adding the following: <br /> Liquid Membrane-Forming Concrete Curing 9-23.2 Special Provisions <br /> ' Compounds <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-06.3 Construction Requirements <br /> Delete the first two paragraphs of 8-06.3 and substitute the following: <br /> Provide Cement Concrete Driveway Type 1, 2 or 3 as the case may be in accordance <br /> with the Standard Specifications and Standard Plan No. 315, 316 and 317. Where <br /> driveways with depressed sidewalk are called for on the Plans, depress the sidewalk <br /> through the driveway area, providing a maximum 2 percent slope from back of sidewalk <br /> Watermain Replacement"U" Division 8—MISC CONSTRUCTION October 1, 2019 <br /> WO No.—UP3698 SP—195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.