My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS ' <br /> Provide combination air release/air vacuum valve in accordance with COE Standard <br /> Drawing 512. <br /> 9-30.3(8) Tapping Sleeve and Valve Assembly <br /> Revise the last sentence of 9-30.3(8) to read as follows: <br /> Provide all stainless-steel tapping sleeves, Romac SST, Romac SSTIII, or City <br /> approved equal. <br /> 9-30.5 Hydrants <br /> Delete first paragraph of 9-30.5 and substitute the following: <br /> Provide fire hydrants with ANSI 125 flanged connection conforming to AWWA C502. <br /> Provide Mueller "Super Centurion No. 250", American Flow Control "Waterous Pacer <br /> No. WB67", or City approved equal. <br /> 9-30.5(2) Hydrant Dimensions <br /> Delete last sentence of first paragraph of 9-30.5(2) and substitute the following: ■ <br /> Provide hydrants having two 2-1/2 inch hose nozzles and one 4-1/2 inch pumper <br /> nozzle. The 4-1/2 inch pumper nozzle shall be National Thread and fitted with a 5- <br /> inch STORZ fitting. <br /> Delete last sentence of second paragraph of 9-30.5(2) and substitute the following: <br /> Paint hydrants with two coats of high gloss Caterpillar yellow, Luxite 6100-516, <br /> Rost-Oleum 7448, or City approved equal. Paint the port caps with two coats of <br /> high gloss black enamel paint. <br /> 9-30.5(4) Hydrant Restraints <br /> Revise the first paragraph of 9-30.5(4) to read as follows: <br /> Provide either mechanical joint restraint system in accordance with 9-30.5(6) of <br /> these Special Provisions, or field lock gaskets for hydrant restraint. <br /> 9-30.6 Water Service Connections (2-inches and Smaller) <br /> 9-30.6(1) Saddles <br /> Revise 9-30.6(1) to read as follows: <br /> Provide Romac, Ford, Mueller, or City approved equal single strap ductile iron, <br /> bronze, brass, or stainless-steel service saddle with C.C. (AWWA tapered) thread <br /> for 3/4-inch and 1-inch services. <br /> Provide Romac, Ford, Mueller, or City approved equal double strap ductile iron, <br /> bronze, brass, or stainless-steel service saddle with I.P. thread for 2-inch services. <br /> All materials shall meet the requirements of AWWA C800. <br /> 9-30.6(2) Corporation Stops <br /> Revise 9-30.6(2) to read as follows: <br /> Provide Ford FB600 Series, or City approved equal, corporation stops for 3/4-inch <br /> and 1-inch services as noted on the Plans. I <br /> All materials shall meet the requirements of AWWA C800. <br /> 9-30.6(3) Service Pipes <br /> Delete 9-30.6(3) C PEX-a Tubing in its entirety. <br /> 9-30.6(4) Service Fittings <br /> Revise third paragraph to read as follows: <br /> Provide either compression fittings, or stab type fittings using internal grip and 0 <br /> ring seal, for polyethylene pipe. <br /> Delete the last paragraph in its entirety. I <br /> Supplement 9-30.6(4) with the following: <br /> Watermain Improvement"U" Division 9—MATERIALS October 1, 2019 <br /> WO No. -UP3698 SP—208 <br />
The URL can be used to link to this page
Your browser does not support the video tag.