My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Road Construction Northwest Inc 12/31/2019
>
Contracts
>
Capital Contract
>
Road Construction Northwest Inc 12/31/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2020 10:31:05 AM
Creation date
1/7/2020 10:31:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Road Construction Northwest Inc
Approval Date
12/31/2019
Council Approval Date
12/4/2019
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Replacement U
Public Works WO Number
UP3698
Tracking Number
0002149
Total Compensation
$1,698,632.90
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Road Construction Norrthwest Inc. 11/23/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOG OF EXPLORATORY BORING B-7 <br /> KRAZAN AND ASSOCIATES, INC. PROJECT:Everett Water Main U DATE:09/18/18 <br /> PROJECT NO.:092-18011 PAGE:1 of 1 <br /> LOGGED BY: JL SURFACE ELEVATION:-- <br /> CONTRACTOR:Geologic Drill BORING TYPE: HSA,Trailer Rig <br /> SAMPLE METHOD:SPT,Split Spoon LOCATION:Everett,WA <br /> co <br /> > 173 <br /> z N-VALUE(GRAPH) Natural Moisture <br /> w_1 0 Content <br /> MATERIAL DESCRIPTION 0— D N <br /> a p (Percent) <br /> o j 13- <br /> m a z N 10 20 30 40 10 20 30 40 <br /> Approx. 5-inches of asphalt roadway pavement. <br /> ."., !" Gray-Brown Silty Sand with Gravel(SM)(Dense, Moist) <br /> —. '1i., <br /> 1 € !hi <br /> IO <br /> 15 <br /> .1 <br /> . a <br /> '� 33 <br /> i:4!1 <br /> .:. <br /> i? 15 <br /> IK <br /> .r <br /> i9 <br /> 5J,.::. a <br /> .:• 11 <br /> i 5!} <br /> i <br /> 18 <br /> 41 <br /> €:iia <br /> • 23 f <br /> I <br /> • <br /> • <br /> : ii:r <br /> 14 <br /> is <br /> i <br /> 37 <br /> • 22 <br /> i ,,:: •I <br /> i End of Exploratory Boring <br /> 1 10— <br /> Water Level Initial:. Final:I <br /> Water Observations:Groundwater seepage was not observed. <br /> Notes:— <br /> IWafermain Replacement"U" APPENDIX A-SOIL BORINGS October 1,2019 <br /> WO No. UP3698 SP-223 <br />
The URL can be used to link to this page
Your browser does not support the video tag.