Laserfiche WebLink
I <br /> LOG OF EXPLORATORY BORING B-11 <br /> KRAZAN AND ASSOCIATES, INC, PROJECT:Everett Water Main U DATE:09/19/18 <br /> PROJECT NO.:092-18011 PAGE:1 of 1 <br /> LOGGED BY: JL SURFACE ELEVATION:-- <br /> CONTRACTOR:Geologic Drill BORING TYPE:HSA,Trailer Rig <br /> SAMPLE METHOD:SPT,Split Spoon LOCATION:Everett,WA <br /> j z m-,- N-VALUE(GRAPH) Natural Moisture <br /> w <br /> Content <br /> MATERIAL DESCRIPTION 0— n u) <br /> a.~ iu <br /> p to <br /> Q ° 2 (Percent) <br /> w co a m >iv <co 10 20 30 40 10 20 30 40 <br /> Approx.6-inches of concrete roadway pavement. i <br /> c Gray Silty Sand with Gravel(SM) (Very Dense, Moist) <br /> r. <br /> 1 <br /> 36 <br /> / C. <br /> :: ifl <br /> • <br /> 1i <br /> rI . <br /> ALL. <br /> 11 .I <br /> 5 <br /> .:r <br /> 21 <br /> 33 <br /> i 5111 <br /> :i 1:.:. <br /> • <br /> I ., <br /> c. <br /> y.. 5014-in) 50+ <br /> IEnd of Exploratory Boring <br /> I <br /> 1 10 <br /> Water Level Initial:Y Final: <br /> IWater Observations:Groundwater seepage was not observed. <br /> Notes:-- <br /> ' T'a ermain -ep acemen • <br /> • - • - • : - a .. , ; <br /> WO No. UP3698 SP-227 <br />